Skip to main content
. 2024 Aug 19;14:19208. doi: 10.1038/s41598-024-69542-w

Table 5.

Comparison with current energy management schemes.

Metrics BC-RF ANN-BEVS DRL-BC MOPSO DV2G Proposed MPOA
Memory usage (MB) 6.24 5.26 7.17 4.98 5.02 4.601
Transaction cost 0.84 0.73 0.81 0.69 0.72 0.634
Trading rate (%) 72 80 73 84 77 90
Trading energy volume (kW) 75 82 74 83 79 88