Skip to main content
. 2024 Sep 3;14:20425. doi: 10.1038/s41598-024-71322-5

Table 8.

Results of the total cost for Case 2 with initial inventory variations.

(h+,h-) (5, 5) (5, 7) (7, 5) (7, 7)
Days/Policies DES-NLT DES-LT DES-NLT DES-LT DES-NLT DES-LT DES-NLT DES-LT
1 343.95 392.50 265.79 324.65 257.11 306.27 170.92 229.66
2 470.98 644.34 405.74 586.88 384.59 562.67 309.67 479.92
3 624.93 915.50 539.75 823.66 515.44 810.14 455.07 757.77
7 1195.50 1959.64 1093.37 1868.10 1094.49 1885.15 994.94 1757.35
10 1587.71 2708.39 1513.85 2618.97 1522.73 2658.37 1423.61 2537.67
20 2962.35 5308.98 2917.03 5250.27 2946.88 5248.71 2893.23 5217.35
30 4500.79 7963.10 4333.62 7786.61 4261.00 7788.22 4271.37 7791.38