Skip to main content
. 2024 Sep 4;14:20631. doi: 10.1038/s41598-024-70284-y

Table 3.

Experimental Conditions of Actual and Predicted Values of Removal Efficiency of MB from Wastewater.

Run A: Time min B: Temperature ℃ C: Initial conc mg/L Actual removal efficiency MB (%) Predict removal efficiency MB (%)
1 95 60 300 81.6 78.99
2 10 42.5 300 9.6 11.21
3 95 60 20 60.15 61.42
4 10 25 160 13.9 13.56
5 95 42.5 160 52.78 52.42
6 95 42.5 160 50.25 52.42
7 180 42.5 300 57.13 59.40
8 10 42.5 20 32.76 30.49
9 95 42.5 160 52.8 52.42
10 180 60 160 91.6 91.93
11 95 42.5 160 56.97 52.42
12 180 42.5 20 63.8 62.19
13 180 25 160 33.13 32.13
14 95 25 20 49 51.61
15 95 25 300 13.24 11.97
16 95 42.5 160 49.3 52.42
17 10 60 160 29.6 30.60