Table 1.

Summary of HRMG projects discussed in the literature.

Reference Year MG topology Optimizer Application Location Remarks
34 2023 PV/WT/Tidal/BSS/HES CSO Rural region in Fuxin China Economic and reliability constraints are addressed
37 2022 PV/WT/BSS PSO Rural grid of Guissia Cameroon BSS aids in power factor correction
38 2023 PV/WT/CHP/ESS HOMER Oakland university United States Results demonstrate the economical effectiveness of WT and CHP in off-grid mode
40 2022 PV/FC/BSS HOMER Students services center building United States Interference with MATLAB for control strategy optimization
41 2023 WT/HES BIO Residential load China Various designs of WTs are included
44 2022 PV/Diesel/BSS SSO Northwest region in Delhi India Design of electric vehicle charging station
45 2022 PV/WT/BSS/Diesel HOMER National research center farm Egypt Demand side management participates in peak shaving which in turns the oversizing is avoided
47 2021 PV/WT/BSS GWO Ras-Shaitan in Sinai Egypt Reliability is evaluated using LPSP index
48 2024 PV/WT/HES/BSS HOMER General - Sensitivity analysis of excess electricity
49 2024 PV/WT/HES/FC BIO Residential building China Sensitivity analysis of wind speed and interest rate
50 2024 PV/WT/BSS CPLEX Chinese Yuan China Battery lifetime model is incorporated
51 2024 WT/BSS HSO Typical power system China Various technologies of batteries
52 2024 PV/biomass/Diesel/BSS GPO New Tiba City Egypt Optimal configuration is cropped
53 2024 PV/WT/FC/BSS/HES AVO Marsa Matrouh Egypt V2G technology is considered
54 2024 PV/WT/BSS/Diesel HOMER Uttara University Bangladesh Various aspects have been investigated

*HSO harmony search optimizer, GPO gradient pelican optimizer, AVO african vultures optimizer.