Table 1.
Reference | Year | MG topology | Optimizer | Application | Location | Remarks |
---|---|---|---|---|---|---|
34 | 2023 | PV/WT/Tidal/BSS/HES | CSO | Rural region in Fuxin | China | Economic and reliability constraints are addressed |
37 | 2022 | PV/WT/BSS | PSO | Rural grid of Guissia | Cameroon | BSS aids in power factor correction |
38 | 2023 | PV/WT/CHP/ESS | HOMER | Oakland university | United States | Results demonstrate the economical effectiveness of WT and CHP in off-grid mode |
40 | 2022 | PV/FC/BSS | HOMER | Students services center building | United States | Interference with MATLAB for control strategy optimization |
41 | 2023 | WT/HES | BIO | Residential load | China | Various designs of WTs are included |
44 | 2022 | PV/Diesel/BSS | SSO | Northwest region in Delhi | India | Design of electric vehicle charging station |
45 | 2022 | PV/WT/BSS/Diesel | HOMER | National research center farm | Egypt | Demand side management participates in peak shaving which in turns the oversizing is avoided |
47 | 2021 | PV/WT/BSS | GWO | Ras-Shaitan in Sinai | Egypt | Reliability is evaluated using index |
48 | 2024 | PV/WT/HES/BSS | HOMER | General | - | Sensitivity analysis of excess electricity |
49 | 2024 | PV/WT/HES/FC | BIO | Residential building | China | Sensitivity analysis of wind speed and interest rate |
50 | 2024 | PV/WT/BSS | CPLEX | Chinese Yuan | China | Battery lifetime model is incorporated |
51 | 2024 | WT/BSS | HSO | Typical power system | China | Various technologies of batteries |
52 | 2024 | PV/biomass/Diesel/BSS | GPO | New Tiba City | Egypt | Optimal configuration is cropped |
53 | 2024 | PV/WT/FC/BSS/HES | AVO | Marsa Matrouh | Egypt | V2G technology is considered |
54 | 2024 | PV/WT/BSS/Diesel | HOMER | Uttara University | Bangladesh | Various aspects have been investigated |
*HSO harmony search optimizer, GPO gradient pelican optimizer, AVO african vultures optimizer.