Skip to main content
. 2024 Sep 4;14:20571. doi: 10.1038/s41598-024-70063-9

Table 11.

Validation assessment of the RBN for study case no. 26.

Unit Actual output Simulated output Error (PU)
PV (kW) 1979 1977 0.001
WT (kW) 2340 2489 0.064
Flywheel (#) 5 5 0.011
Converter (kW) 818 736 0.101