Skip to main content
. 2024 Sep 4;14:20571. doi: 10.1038/s41598-024-70063-9

Table 13.

Energy management of FCS components using RBN.

Gav Tamb Van Served load UMLf(\%) RoI(\%) PV (kW) WT (kW) Flywheel (#) Converter (kW)
 + 5%  + 5%  + 5%  + 2% 15.3 − 4 1829 1813 4 1294
 + 6%  + 6%  + 4% 0 10 − 4 1033 4782 14 1421
 + 2%  + 3%  + 3%  + 1% 3 − 3 1244 6165 6 1437
 + 7%  + 6% − 2%  + 1% 15.3 − 4 3067 3318 6 489
− 2% 0 0  + 1% 5 − 3 2304 5426 6 1465
0 − 5%  + 5% 0 3 − 3 1679 5587 14 2216
0  + 4% − 4%  + 1% 15.3 − 4 3265 3348 6 613
− 3% − 4% 0 0 15.3 − 4 3434 2835 13 1297
 + 2% − 8% − 5%  + 2% 0 0 10,068 418 3 4123
− 2% 0  + 2%  + 2% 0 0 9398 512 3 3922