Data retrieval |
|
Database Access |
Verify access to WoS Core Collection |
1 day |
Search Query Design |
Develop and refine search queries for specific topics |
2–3 days |
Initial Search |
Conduct initial searches to gather relevant literature |
1–2 days |
Filtering and Refinement |
Apply filters and refine search results for relevance |
2–3 days |
Download Data |
Download the filtered search results for analysis |
1 day |
|
Data preparation |
|
Data Cleaning |
Clean and format data for consistency |
2–3 days |
Data Integration |
Integrate data from multiple sources if necessary |
1–2 days |
|
Visualization |
|
Tool Setup |
Install and configure CiteSpace and VOSviewer |
1 day |
Data Import |
Import cleaned data into visualization tools |
1 day |
Preliminary Analysis |
Run initial visualizations to check data integrity |
1–2 days |
Visualization Tuning |
Adjust visualization parameters for optimal clarity |
2–3 days |
|
Analysis |
|
Interpretation |
Analyze visualizations to extract meaningful insights |
2–3 days |
Reporting |
Document findings and insights from visualizations |
2–3 days |