Skip to main content
. 2024 Sep 19;14:21857. doi: 10.1038/s41598-024-72124-5

Table 5.

Summary of results with and without TCSC.

Without TCSC With TCSC (Case a) With TCSC (Case b)
Base case MOGWO MOPSO MOGWO MOPSO MOGWO MOPSO
Real Power Loss (MW) Reactive power loss (MVAR) Real Power Loss (MW) Reactive power loss (MVAR) Real Power Loss (MW) Reactive power loss (MVAR) Real Power Loss (MW) Reactive power loss (MVAR) Real Power Loss (MW) Reactive power loss (MVAR) Real Power Loss (MW) Capital Cost of TCSC (US$/KVar) Real Power Loss (MW) Capital Cost of TCSC (US$/KVar)
5.593 21.0658 5.2833 20.4436 5.3048 20.4656 5.0675 20.1246 5.0834 20.1323 5.0596 149.2531 5.0625 150.6561