Table 7.
Time Comparison of Man-Machine Efficiency at the 50th Repeated Inspection.
| Number of optical fibers | Our method (s/optical fiber) | Manual work (s/optical fiber) | Ratio (manual work/our work) |
|---|---|---|---|
| 12 | 51.67 | 71.75 | 1.39 |
| 36 | 50.56 | 75.03 | 1.48 |
| 64 | 50.14 | 90.00 | 1.79 |