Skip to main content
. 2024 Sep 19;10:e2285. doi: 10.7717/peerj-cs.2285

Table 4. Post-test results.

Group Mean SD Skewness Kurtosis Std. Error mean
Task completed Intervention group 15.80 3.014 0.298 −0.933 0.60
Control group 12.24 1.786 0.704 −0.246 0.357
Task score Intervention group 143.72 29.365 0.682 −0.459 5.873
Control group 103.16 15.367 1.152 1.576 3.073
Code quality Intervention group 71.04 15.380 0.032 −0.963 3.076
Control group 53.32 10.535 1.152 1.075 2.107
Timeliness of task Intervention group 13.84 3.436 0.375 −1.250 0.687
Control group 8.80 1.354 0.066 −1.101 0.271
New course Intervention group 3.84 1.724 −0.527 −1.024 0.820
Control group 1.28 0.980 0.245 −0.842 1.578
Average score in team tasks Intervention group 64.14 4.099 −0.393 −0.620 0.345
Control group 52.46 7.890 −1.173 0.784 0.196