Skip to main content
. 2024 Sep 11;10(18):e37360. doi: 10.1016/j.heliyon.2024.e37360

Table 6.

WCMS vs. State-of-the-Art Methods in Time-Wise Cross-Validation Scenario (ACC).

Project Baseline Methods
RF
XGB
LGBM
EALR MULTI DEJIT LT AGE CCUM FI MO FI MO FI MO
BUG 0.286 0.598 0.552 0.449 0.375 0.697 0.475 0.871 0.446 0.574 0.417 0.962
COL 0.400 0.686 0.636 0.440 0.568 0.720 0.584 0.840 0.551 0.778 0.444 0.909
JDT 0.323 0.625 0.592 0.452 0.408 0.637 0.642 0.804 0.573 0.763 0.443 0.750
PLA 0.305 0.688 0.684 0.432 0.429 0.704 0.659 0.806 0.550 0.700 0.429 0.748
MOZ 0.180 0.549 0.545 0.363 0.280 0.582 0.696 0.816 0.605 0.713 0.361 0.833
POS 0.356 0.592 0.560 0.432 0.426 0.615 0.609 0.929 0.611 0.780 0.428 0.824
MEAN 0.308 0.623 0.595 0.428 0.414 0.659 0.611 0.844 0.556 0.718 0.420 0.838