Skip to main content
. 2024 Sep 11;10(18):e37360. doi: 10.1016/j.heliyon.2024.e37360

Table 7.

WCMS vs. State-of-the-Art Methods in Time-Wise Cross-Validation Scenario (Popt).

Project Baseline Methods
RF
XGB
LGBM
EALR MULTI DEJIT LT AGE CCUM FI MO FI MO FI MO
BUG 0.594 0.838 0.709 0.721 0.661 0.909 0.771 0.988 0.756 0.841 0.737 0.986
COL 0.619 0.885 0.825 0.732 0.786 0.907 0.824 0.929 0.785 0.863 0.727 0.975
JDT 0.590 0.828 0.782 0.709 0.685 0.837 0.842 0.923 0.778 0.865 0.691 0.861
PLA 0.583 0.859 0.835 0.717 0.709 0.868 0.860 0.931 0.772 0.869 0.695 0.841
MOZ 0.498 0.786 0.737 0.651 0.638 0.802 0.866 0.926 0.796 0.882 0.675 0.949
POS 0.600 0.837 0.768 0.742 0.731 0.866 0.828 0.977 0.809 0.888 0.688 0.919
MEAN 0.581 0.839 0.776 0.712 0.702 0.865 0.832 0.946 0.783 0.868 0.702 0.922