Table 2.

Updates to E-lite before inclusion in the ITER full model

# Update
1 A new representation of the Blanket Shield Modules in rows #7–#12 and the explicit representations of cooling channels in 80% of the blankets
2 Implementation of dedicated block structure elements to facilitate local models upgrade (later called “envelopes”) for: upper port (UP) chimneys, TCWS, the Thermal Shield shrouds, the Tokamaks Dust Filter System in UP #4–#7 and ICF
3 The adjustment of envelopes to include the cryostat cryopump in lower ports (LP) #7 and #13
4 The adaption of the correction coil envelopes to a 360° representation of the machine
5 The adjustment of the envelopes of Vacuum Vessel Poloidal Sector #44 penetrations in LP#01-#09-#11-#13-#15-#17
6 An updated representation of UP#4-#5-#6-#7 port plug environment
7 The implementation of the spare pre-compression rings
8 The amendment of the interface between the divertor inner rail cover plate and the Blanket Shield Module #1.