Skip to main content
. 2024 Oct 7;12:1394798. doi: 10.3389/fpubh.2024.1394798

Table 1.

Description of the selected WWTPs.

WWTP name Sub-city/location Design capacity m3 per day Average daily flow rate in m3 per day Served population Type of treatment technology in place
1 Kality treatment plant (KTP) Akaki Kality Sub-City/ Southern Addis Ababa 100,000a 65,000 2,000,000 USAB
2 Bulbula Treatment Plant Bole Sub-City/ Central Addis Ababa
20,000b 325 34,000 MBR
3 Mikililand Wastewater Stabilization Pond (WSP) Kolfe-Keranio Sub-City/ Northwest Addis Ababa
3,000c NA 24,000 WSP

Description of the selected WWTPs for this surveillance of SARS-CoV-2 in Addis Ababa, Ethiopia. aInformation was collected from the AAWSA authority. b,cInformation was from the literature that is cited (37) and (42). NA = Not available (we did not know the average flow rate due to lack of measuring instruments at the WSP).