Table 1.
Overview of studies: manipulations and risk preference measures
| Background uncertainty | Risk preference measure | Design | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Risk | Ambiguity | LDT | BART | BRET | CEM | MPL | SCL | ||
| Study 1 | X | X | X | B/L | |||||
| N=85 | |||||||||
| Study 2 | X | X | X | B/L | |||||
| N=101 | |||||||||
| Study 3 | X | X | X | X | X | B/O | |||
| N=185 | |||||||||
| Study 4 | X | X | X | X | X | W/O | |||
| N=492 | |||||||||
Note. LDT = binary lottery decision task, BART = Balloon analogue risk task, BRET = Bomb risk elicitation task, CEM = Certainty equivalent method, MPL = Multiple price list, SCL = Single choice list; B = between subject design, W = within subject design, O = online study, L = lab study