Skip to main content
. 2024 Nov 1;2(1):36. doi: 10.1038/s44296-024-00034-8

Fig. 7. Dome 5.1 built with disassembled materials.

Fig. 7

Computational design93 (left) and test the construction (right) (Photography: Daniel Winkler).