Table 2.
1. Detection | 2. Disassembly | 3. Distribution | 4. Design | 5. Deployment | |
---|---|---|---|---|---|
To fully upscale reuse from the existing building stock, we need to: | Identify buildings pre-demolition | Invent materials for post-disassembly sorting | Give materials an identity for new construction sites | Design with the available stock of reused materials | Fabricate buildings with bespoke reused materials |
Methods | Data and image processing to identify material stock in cities | Geometry and material identification | Database management for tracking, tracing and trading | Human-machine interaction for creativity support | Connection fabrication and assembly |
Digital technology |
• ML • CV |
• Reality capture • Scan-to-BIM • CV • XR |
• DPPs • Tracking and tracing technologies • Blockchain |
• Generative AI • Computational design algorithms |
• Additive & subtractive manufacturing • XR |
Case studies | • Zurich City |
• Geneva warehouse • Zurich music pavilion • K118 |
• Database of disassembled timber beams for reuse in domes |
• Dome 5.1 • Dome 5.2 |
• Dome 5.1 • Dome 5.2 • Dome 5.x |