Table 5.
Model | R | R 2 | Adjust R2 | Standard estimated error | Durbin–Watson | F | P |
---|---|---|---|---|---|---|---|
1 | 0.924a | 0.854 | 0.839 | 8.389 | 1.572 | 55.119 | <.001 |
Model | R | R 2 | Adjust R2 | Standard estimated error | Durbin–Watson | F | P |
---|---|---|---|---|---|---|---|
1 | 0.924a | 0.854 | 0.839 | 8.389 | 1.572 | 55.119 | <.001 |