Skip to main content
. 2024 Oct 30;635(8037):108–113. doi: 10.1038/s41586-024-08096-3

Fig. 5. Scaling of SMB model runoff estimates.

Fig. 5

Scaling factors for warm (a), ordinary (b) and cold (c) years, to be applied to the SMB model runoff estimates to achieve a best match with GNET station observed vertical displacements. Error bars are defined on the basis of the 1st and the 3rd quartiles as the lower and upper bounds, respectively, from 100 Monte Carlo runs.