Skip to main content
. 2024 Oct 22;31(Pt 6):1582–1592. doi: 10.1107/S160057752400907X

Figure 8.

Figure 8

New SLS 2.0 HP slits. Left: photograph of the assembled HP slits ready for installation. Middle: 3D model of HP slits showing construction details. Right: front view of the two slits. The first slit trims the lower and right part of the beam, while the second slit trims the upper and left part.