Skip to main content
. 2024 Nov 14;14:28027. doi: 10.1038/s41598-024-75988-9

Table 3.

Initial water level conditions for seepage calculations.

Calculation conditions (m) Normal water level Design flood level
Calculation of beach length (m) Calculation of water level (m) Chemtrail beachcomber (m) Elevation of water level (m) Calculation of beach length (m) Calculation of water level (m) Chemtrail beachcomber (m) Elevation of water level (m)
5070 500 5067.5 65.2 5069.67 396 5068.02 8.3 5069.71
5081  500 5078.5 65.2 5080.67 406 5078.97 59.0 5080.71
5159 800 5155.0 81.7 5158.59 748 5155.26 79.1 5158.6
5213 1000 5208.0 90.9 5212.55 950 5208.25 88.7 5212.56