Skip to main content
. 2024 Nov 20;14:28704. doi: 10.1038/s41598-024-79555-0

Table 1.

The distribution of test examples.

Variables Value or distribution
Job number 10, 20, 30, 40, 50, 60
Stage number 3, 5, 10
Max number of available machines per stage U[1, 4]
Welding time U[8, 20]
Transport time U[2, 5]
Preheat time U[1, 3]