Parameters of the considered HTGS.

Parameter Value
Tj2(Time constant of upstream surge tank) 475.948(s)
Tj4(Time constant of downstream surge tank) 2500(s)
Tw1(Time constant of diversion tunnel) 3.220(s)
hf1(Relative head loss of diversion tunnel) 0.026
Tw3(Sum of the time constants of penstock and draft tube) 0.82(s)
hf3(Relative head loss of the pipe) 0.010
Tw5(Time constant of tailrace tunnel) 0.26(s)
hf5(Relative head loss of tailrace tunnel) 0.015
Ty(Time constant of servo-mechanism system) 0.2(s)
Ta(Time constant of synchronous generator-motor) 8.5(s)
ex,eh,ey(Transfer coefficients of turbine) −1.000,1.500,1.000
eqh,eqy,eqx(Transfer coefficients of turbine) 0.5,1.000,0