Table 2.
Considered scenarios.
Scenarios | Internal Pressure | Gravity | Vehicle Load | Subsidence | Pipeline Buried Depth |
---|---|---|---|---|---|
1 | 4.8 MPa | g = 9.8 m/s2 | Ignoring | 0 m | 6 m |
2 | 4.8 MPa | g = 9.8 m/s2 | Bridge vehicle 49 t | 0 m | 6 m |
3 | 4.8 MPa | g = 9.8 m/s2 | Bridge vehicle 10.4 t | 0 m | 6 m |
4 | 4.8 MPa | g = 9.8 m/s2 | Bridge vehicle 10.4 t | 0.02 m | 6 m |
5 | 4.8 MPa | g = 9.8 m/s2 | Ignoring | 0 m | 1 m |
6 | 4.8 MPa | g = 9.8 m/s2 | Bridge vehicle 10.4 t | 0 m | 1 m |
7 | 4.8 MPa | g = 9.8 m/s2 | Ignoring | 0.02 m | 6 m |