Table 2.
Number of bundles (#Bu) and of bids (#Bi) generated by the 3D corridors approach with different values of thickness
| 1 h | 2 h | 3 h | 4 h | |||||
|---|---|---|---|---|---|---|---|---|
| #Bu | #Bi | #Bu | #Bi | #Bu | #Bi | #Bu | #Bi | |
| 20STW | 44.2 | 163.4 | 47 | 172.9 | 50.3 | 179.6 | 54.6 | 190.6 |
| 20MTW | 45.4 | 170.5 | 50 | 180.8 | 51.1 | 183.1 | 54.3 | 190.7 |
| 20LTW | 37.5 | 135.8 | 37.5 | 135.8 | 37.5 | 135.8 | 36 | 131.8 |
| 40STW | 110.8 | 709.5 | 124.2 | 779.3 | 128.8 | 810.2 | 133.8 | 836 |
| 40MTW | 112.8 | 717.4 | 124.7 | 777.8 | 133.6 | 828 | 135.3 | 841.3 |
| 40LTW | 85.1 | 572.9 | 85.1 | 571.8 | 86.1 | 577.6 | 77.5 | 523.1 |