Skip to main content
. 2024 Dec 20;12(6):2400145. doi: 10.9745/GHSP-D-24-00145

TABLE 4.

Changes in Performance Monitoring Team Functions at Health Facility Level in Intervention and Control Sites, Ethiopia

Baseline (2020), % Endline (2022), % Change, %
Indicators Control(n=37) Intervention(n=49) Control(n=38) Intervention(n=42) Control Intervention DID
HFs with PMT 95 98 92 98 −3 0 +3
HFs having regular PMT (≥3 in assessed 3 months) 54 60 66 90 +12 +30 +18
Availability of at least 1 PMT meeting minutes 81 80 89 93 +8 +13 +5
PMT meetings chaired by facility director (all 3 months) 63 68 53 85 −10 +17 +27
HFs discussed performance using HMIS data 54 57 89 93 +35 +36 +1
HFs identified performance- related problems 63 67 74 86 +11 +19 +8
HFs conducted root cause analysis 47 49 66 79 +19 +30 +11
HFs developed action plan to improve performance 47 61 71 81 +24 +20 −4

Abbreviations: DID, difference-in-difference; HF, health facility; HMIS, health management information system; PMT, performance monitoring team.