Skip to main content
. 2024 Dec 28;14:30742. doi: 10.1038/s41598-024-80540-w

Table 3.

Time breakdown for each sub-process in the automated blade weighing and sorting system.

Process step Time (s)
Moving robot to initial alignment with blade 7
Blade location refinement and gripper positioning 5
Grasping and weighing 6
Returning blade to slot and moving to home position 7
Total 25