Skip to main content
. 2025 Jan 2;15:346. doi: 10.1038/s41598-024-83521-1

Table 2.

Techno-economic WT data3840.

Parameter Value
Nominal power (MW) 1
Nominal WS (m/s) 13
Cut-in WS (m/s) 3
Cut-out WS (m/s) 20
Capital cost ($/unit) 3000
M&O cost ($/yr) 30
life span 20