Skip to main content
. 2025 Jan 2;15:346. doi: 10.1038/s41598-024-83521-1

Table 7.

Energy not-met of the network with respect to the different uncertainty budgets in scenario 2.

σ 0.05 0.10 0.15 0.20 0.25 0.30
Energy not-met (MWh/yr) 125.43 133.45 136.38 143.79 154.86 161.15