Skip to main content
. 2025 Jan 6;15:989. doi: 10.1038/s41598-024-83284-9

Table 8.

Benefits after applying the proposed strategy for every case study.

Case study Daily total energy losses (MWh/day) Daily total voltage deviation (p.u) Daily total gas emissions limitation ($/day) Daily min voltage profile (p.u) Daily minimum VSI (p.u) Daily total operational cost ($/day) Daily total power grid (MWh/day)
Before DRP 1.08 0.357 1201.1364 0.9521 0.8161 6798.411 48.2064
DRP based CIR 0.7211 0.2236 1165.4705 0.9603 0.8472 6179.2091 42.141
DRP based IIR 0.6682 0.1931 1130.8069 0.9629 0.8569 6082.69 40.7495