Skip to main content
. 2023 Jul 20;21(1):329–357. doi: 10.1080/23249935.2023.2236240

Public transport data.

Line Segment Running time (min) Distance (km) Headway (min) Area (m2)
Line 1 (A, Z) 25 10 6 20
Line 2 (A, X) 7 3.5 6 20
Line 2 (X, Y) 6 3 6 20
Line 3 (X, Y) 4 3 15 20
Line 3 (Y, Z) 4 3 15 20
Line 4 (Y, Z) 10 3 3 20