Fig. 8.
Validation of the developed DMST model: a) Influence of the number of tubes (left), b) Comparison with 7 kW VAWTs Paraschivoiu's model [25] (right).
Validation of the developed DMST model: a) Influence of the number of tubes (left), b) Comparison with 7 kW VAWTs Paraschivoiu's model [25] (right).