Table 1. Comparison of the real transition point coverage ratio and redundancy ratio of potential transition points under different minimum trough lengths.
TRmin (s) | Transfer point coverage (%) | Redundancy rate (%) |
---|---|---|
1.0 | 68.1 | 53.1 |
1.5 | 71.0 | 54.2 |
2.0 | 75.2 | 51.0 |
2.5 | 69.5 | 53.4 |
3.0 | 65.2 | 50.4 |