Table 2.
Calculation assumptions of economic analysis of the developed SDET.
| Parameter | Value |
|---|---|
| Interest rate | 20% |
| Maintenance cost | 3% of the annual capital cost |
| Salvage value | 8% of the annual capital cost |
| Operating life | 30 years |
| Inflation rate | 39.7% |