Skip to main content
MethodsX logoLink to MethodsX
. 2025 Mar 11;14:103261. doi: 10.1016/j.mex.2025.103261

Corrigendum to ``Efficient scheduling of multiple software projects for work continuity and identical completion time'' [MethodsX 14 (2025) 103215]

AbdulRahman AlDhubaiban 1, Ali AlMatouq 1,
PMCID: PMC11957779  PMID: 40165853

The authors regret that Fig. 3 of the above-mentioned published article is incorrect and there was a mistake in the submission. The figure numbers the employees from 0 to 7, whereas the correct numbering should be from 1 to 8. Furthermore, Fig. 3 shows a different random permutation of the same experiment and is not consistent with Fig. 2.

Unlabelled image


Articles from MethodsX are provided here courtesy of Elsevier

RESOURCES