Identification of recycling potential of construction and demolition waste: challenges and opportunities in the Greater Dhaka area

Shama E Haque 1, Nazmun Nahar 1, Nafisa N Chowdhury 1,2, Lameesa Gazi-Khan 1, Tasriba K Sayanno 1, Md Abdul Muktadir 1, Md Sazzadul Haque 1,3,
PMCID: PMC12065737  PMID: 40347400

Abstract

In the past five decades, Dhaka city, the capital of Bangladesh experienced urbanization in an unprecedented manner. The city has grown spatially in all directions to accommodate the urban population that resulted in accelerated growth of the construction and demolished floor areas in Dhaka and its surroundings, commonly known as the Greater Dhaka. As a result, the quantities of construction and demolition waste have increased significantly within this region. Through an onsite field investigation of 21 construction and 12 demolition project sites in Greater Dhaka, the study identified the waste generation rate to be approximately 463.67 kg and 90.31 kg per m2 floor area of demolition and construction projects, respectively. Projection based on this waste generation rate; the annual waste amount has been calculated for the eight districts of the Greater Dhaka region. The recycling potential identified through this study also estimated the economic benefits of the studied construction and demolition waste (CDW) materials for these eight districts for years 2022 to 2030. The findings of the present study are expected to assist the relevant stakeholders and policymakers to devise business development and legislative measures for the successful implementation of the sustainable waste management plan for the construction industry.

Keywords: Greater Dhaka, Construction and demolition waste, Recycling, Sustainability, Environmental impact

Introduction

Globally, the rate of urbanization is increasing. In 2018, approximately 55.30% of people were reported to live in urban settlements which is projected to be 60% by 2030 (UN, 2018). Urbanization involves building activities that makes generation of Construction and Demolition Waste (CDW) an integral part of the urbanization process (Papamichael et al., 2023). Generally, CDW is defined to be the undesirable, heterogeneous residual matters that are particularly generated from different construction, renovation, and demolition activities of various infrastructures (Pallewatta et al., 2023). Different types of non-biodegradable items – concrete, mortar, metals, brick, wood, plastic, glass, tiles, excavated soils, asbestos, etc. – are the main constituents of CDW (Bianchini et al., 2020).

During the last five decades, Dhaka city, the capital of Bangladesh, has expanded across all directions and has transformed into a megacity. It is expected to be the home of approximately 28 million people by 2030, making it the fourth most populous megacity in the world (Ahmed & Montu, 2021). Dhaka, Bangladesh's economic center, is rapidly becoming more urbanized to meet the demands of its expanding population and the growing need for construction projects, utilities, and other services. Drainage, water supply, solid waste management, sewerage, sanitation, housing, and transportation; all these sectors result in the production of massive amounts of construction and demolition waste (CDW). Materials produced during new construction are classified as construction waste and materials generated from the tear-down of structures and buildings are referred to as demolition waste.

Previous studies on Dhaka's urban growth identified the city's difficulty in expanding horizontally due to flood risk or ongoing encroachment on natural wetlands and depressions (Ahmed & Bramley, 2015; Dewan & Yamaguchi 2009; Roy, 2009). As a result, in the city center, multi-story structures are the primary means of absorbing its 20 million residents, with 400,000 arriving each year (WB, 2007). Currently, Dhaka's densely populated metropolitan center is undergoing considerable reconstruction, with traditional six-story buildings being replaced with higher and heavier ones. Additional stories are being added to existing structures, frequently exceeding the allowable bearing strain on the subsoil supported by the foundations (Günther et al., 2015). Based on an analysis of Landsat-derived wetland maps, in recent years, the city has expanded spatially mostly by landfilling (76.67%) and encroachment (18.72%) that resulted in significant reduction of wetlands, rivers and khals (i.e., canals) (Habiba et al., 2011). Existing urban buildings underwent significant modifications to meet the growing demand for housing, office space, and other commercial setups. In general, upazilas (sub-district) within the Dhaka District, Narayanganj city, Bandar, and Rupganj Upazilas in Narayanganj District, Gazipur Sadar and Kaliakair Upazilas in Gazipur District, and Narsingdi Sadar in Narsingdi District are collectively referred as the Greater Dhaka area. The World Bank estimates that Greater Dhaka will have a population of 25.0 million people by 2035 and a per capita income of US$ 8,000 calculated based on the rate of 2015 (Bird et al., 2018).

A review of the existing literature on CDW indicates that there is a research gap in the waste generation rates (WGR) of Greater Dhaka area. Most of the research and technical resources related to the CDW management scenario in Dhaka City are informal (i.e., unpublished field survey reports, anecdotal evidence) and inadequate. For instance, using WGR and regression analysis, Islam et al. (2019) offered a method to estimate CDW generation in Dhaka city. According to the findings, WGR was 1615 kg/m2 for demolition activities and 63.74 kg/m2 for construction activities. In the fiscal year 2016, Dhaka city produced 1.28 million tons of waste (0.15 MT construction and 1.13 MT demolition), with concrete accounting for 60% of the debris, brick/block accounting for 21%, and mortar making up 9% (Islam et al., 2019). Haque et al. (2024) assessed the recycling potential and waste generation rates for the CDW in Dhaka and found that the average WGR for construction and demolition per unit area (m2) was approximately 73.90 kg and 575.0 kg, respectively. To the best of the authors’ knowledge, no study has been conducted to this date to investigate the WGR and recycling potential of the CDW and its adverse environmental impacts in the Greater Dhaka area.

Rapid urbanization and infrastructure development have made CDW a global issue due to its negative effects on sustainability's socioeconomic and environmental aspects (Daoud et al., 2021, 2023b). Developing countries (e.g., in Asia and Africa) still lack structured policy measures, recycling infrastructures, and economic incentives, despite the proven major challenges – environmental degradation, resource depletion, and GHG emissions—associated with the poor management of CDW (Daoud et al., 2023a; Ismail et al., 2023; Papamichael et al., 2023; Umar, 2022). In the regional context, Bangladesh faces similar challenges, particularly in the Greater Dhaka area, where rapid urban expansion and unprecedented rise in construction activities (Bird et al., 2018) have exacerbated an urgent need for effective CDW management infrastructure.

The objective of this present study is to address this gap by examining the current waste generation scenario in the Greater Dhaka region to assess the current waste disposal practices followed by the opportunities for efficient management. The study also investigates the recycling potential of the key waste components, evaluates the feasibility of recycling, and explores the economic benefits and challenges related to sustainable CDW management. Furthermore, the study aims to explore appropriate policy measures suitable to the region’s socioeconomic and infrastructural landscape for an improved and circular CDW management situation.

Literature review

Globally, CDW management receives increasing attention from researchers as more and more people move to urban areas. For instance, Lu et al. (2011) conducted a study to investigate waste generation rate through on-site waste sorting and weighing in active construction projects in Shenzhen City in China. They found that the WGR ranged from 3.28 to 8.79 kg/m2 where concrete and timber are the major components of the generated waste. A study based in Bolivia examined CDW management, revealing that CDW generation rates in concrete residential buildings range from 91.90—113.30 kg/m2 during construction and 867.20—1064.80 kg/m2 during demolition (Ferronato et al., 2023). The findings suggest that La Paz city in Bolivia generates around 350,000 tons of CDW annually, recycling up to 71.10% of inert aggregates is feasible, with estimated costs ranging from 7.80 to 31.10 USD per ton of CDW, making an economically viable system possible, especially through source separation and hybrid stationary and mobile recycling facilities. The Chennai City in India generated 1.14 MT of CDW in 2013 (Ram & Kalidindi, 2017) whereas in Malaysia and Vietnam the reported amount was around 8.0 MT in 2021 and 5.30 MT in 2018, respectively (Menegaki & Damigos, 2018; Rahim et al., 2017). In Egypt, more than 40% of the materials’ costs in construction projects are found to be from CDW whereas these items are reported to be primarily disposed of indiscriminately (Daoud et al., 2023b).

Yuan and Shen (2011) investigated the latest research trend in the discipline by analyzing the publications from major international journals (2000–2009) and found that on-site surveys and local or regional case studies are the primary methods for CDW data collection and further investigation. UNEP (2015) reported that even though CDW waste is a global contributor to solid waste generation, it receives considerably less attention in the literature compared to municipal solid waste (MSW), which can be explained by the benign nature of CDW compared to that of MSW. Menegaki and Damigos (2018) revealed countries in the European Union (EU) generate a higher amount of CDW annually than any other Asian countries. Additionally, the findings indicate that the management of CDW has evolved into a social, environmental, and economic problem that needs urgent research for its subsequent valorization process. Table 1 presents a summary of some previously published research as an effort in developing current advancement on CDW management issues in different regions of the world.

Table 1.

Summary of selected research on construction and demolition waste management

Source Main objective Summary of findings
Haque et al. (2023) This paper focused on CDW management practices in Mymensingh, Bangladesh, and their effect on the neighboring environment The study summarizes that among the 300 construction sites observed, 31% of the materials are recycled, 26% are reused, and the other items are classified as construction waste. The CDW is responsible for detrimental environmental effects such as bank scourging, and river flood levels
Moschen-Schimek et al. (2023) A review of the waste recovery rates of CDW in the EU According to the paper, CDW streams have a high potential for recycling. For these reasons, the European Commission established a CDW recovery target that member states must meet to submit their national CDW data to the EU
Tihomirovs et al. (2023) A review of possible ways of utilizing waste glass in some useful products in the construction industry The review highlights substantial efforts at exploring the potential use of waste glass as a substitute for natural aggregates and cement in various concrete applications. It also specifies that there are at least seven areas where demolition waste glass can be used such as concrete products, gypsum–cement composites, asphalt or concrete pavement etc
Datta et al. (2022) Identification of construction waste-generating factors and management strategies for the construction industry of Bangladesh The study involved a comprehensive examination, incorporating multiple surveys with diverse construction professionals. The survey utilized the Likert scale and prioritized waste-generating factors. The factor identified revealed that'deposited material in a public place'is the most significant contributor to waste on construction sites in Bangladesh
Zhang et al. (2022) This paper explores the evolution of the waste hierarchy in Europe and how it compares with the circular economy The study employed the waste hierarchy to investigate the management of CDW in Europe. The study highlighted the parallel evolution of the circular economy, emphasizing a novel approach to waste management by reevaluating, redesigning, and repurposing products to enhance resource efficiency and diminish waste generation throughout their life cycle
Ngieng et al. (2021) Governmental policies in Malaysia, Singapore and Thailand, highlighting that concrete production contributes to roughly 10% of the total synthetic CO2 emission The paper summarizes that governments in Southeast Asia have implemented various measures, including legislative acts, rules and incentives to mitigate the adverse effects of construction on the environment
Makul et al. (2021) This review article discussed the lack of practical application of recycled concrete in Southeast Asia The paper highlights while this region’s governments have initiated rules to foster sustainable concrete, there's a lack of awareness and economic feasibility that hinders the practical implementation of recycled aggregate concrete (RAC)
Prema (2021) The effectiveness of existing legislation of India, in regulating the construction sector and how far they comply with the international standard of protecting the environment The findings of the study indicate that CDW waste presents a significant environmental threat in India. Despite legislative reforms in the country, comprehensive CDW waste management remains limited, demanding a broader, more adaptable approach to tackle India's CDW waste challenge
De Luca et al. (2020) This paper discussed the significant environmental impact of concrete production due to high emission of CO2 The findings of the paper indicate that recycling construction and demolition waste could yield a positive net benefit compared to producing virgin aggregate materials with similar properties. This approach not only offers financial advantages but also represents an environmentally sustainable option, requiring fewer resources for aggregate production
Ma et al. (2020) This paper investigated challenges in CDW recycling in China through site visits to 10 recycling plants and interviews with 25 industry practitioners. Eight key challenges are identified, including lack of regulations The study highlights the potential of recycling as an alternative to landfill for managing CDW in China but identifies significant challenges in policy implementation. Eight key challenges in CDW waste management identified in the study including unstable waste sources for recycling, lack of subsidies for recycling activities, inadequate focus on waste minimization in design etc
Tang et al. (2020) This paper presented a review of studies focusing on recycling construction solid waste to produce geopolymer composites Overall, the study highlights an economical and sustainable alternative for managing municipal and construction solid waste through recycling into construction materials such as geopolymer composite
Islam et al. (2019) This study addressed the increasing CDW challenge in Bangladesh by estimating WGR and analyzing the economic benefits of recycling Findings of the study reveal that recycling CDW waste presents entrepreneurial and economic opportunities, offering environmental benefits and significant CO2 emissions reductions
Turkyilmaz et al. (2019) The paper focused on analyzing and improving CDW management practices in a leading construction company in Kazakhstan The study mentions few recommendations including leveraging technologies like Building Information Modeling (BIM) for waste reduction and improving employee awareness through training programs. The findings of this study have implications for other construction companies in Central Asia as well
Whittaker et al. (2019) A multi-step study done in the EU that was set up to develop sorting technologies to improve the quality of CDW-derived aggregate The study reused CDW waste by repurposing concrete as aggregate and timber in new panels. Environmental impact analysis showed that the panels made of repurposed timber had close to 50% or a smaller number of environmental impacts when compared to virgin materials being used for construction

Materials and method

Study area

In the past few decades, Dhaka City experienced rapid growth and is now one of the world’s largest megacities (Roy, 2021). In the 2001 census, the Dhaka Statistical Metropolitan Area covered a total of 1,353 km2, with Dhaka City Corporation occupying 276 km2. Currently, the metro area population of Dhaka is 23,210,000, which is a 3.26% increase from 2022 (Macrotrends, 2023). The metropolitan area includes the Dhaka City Corporation (north and south wing) referred herein as Dhaka City, as well as parts of neighboring areas such as Savar and Keraniganj. The study areas for the current project include Dhaka, Gazipur, Narayanganj, Manikganj, and Munshiganj located within Greater Dhaka region; covering an area of around 4929.45 km2 (Khan et al., 2024). Figure 1 shows the map of study areas focusing on the construction and demolition sites that were surveyed during the period of study (2022–2024).

Fig. 1.

Fig. 1

Map showing the location of the studied construction and demolition project sites within different regions of Greater Dhaka. Note: DP-GD – Demolition project site in Greater Dhaka; CP-GD – Construction project site in Greater Dhaka

Details of the studied sites

For the present study, a total of 21 construction sites were surveyed within the study areas. Among the 21 construction project sites, four primary categories—residential (71.43%), mixed-use (residential and commercial) (19.05%), industrial/factory (4.76%), and commercial (4.76%)—were identified. A total of 12 demolition sites were considered that have a diverse occupancy type, incorporating residential (41.67%), mosque or religious infrastructure (8.33%), school (8.33%), industrial/factories (25.00%), reinforced cement concrete (RCC) water tank (8.33%), and mixed-use (residential and commercial) sites (8.34%). The selection of 21 construction and 12 demolition sites in Greater Dhaka was driven by a purposeful sampling technique (Palinkas et al., 2015), designed to encompass the variety of building and demolition activity in the area. This technique guaranteed the incorporation of diverse project kinds, dimensions, and developmental phases, enhancing the sample's representation within the region. The selected construction sites include residential, mixed-use, industrial, and commercial categories, whilst the demolition sites comprise residential, institutional, industrial, and mixed-use facilities. These diversified samples facilitate a thorough evaluation of CDW generation across multiple sectors and illustrate the CDW management situation in Greater Dhaka.

The residential lands or plots varied in size from 200.88 to 648.17 m2 and 267.84 to 468.72 m2 for the studied construction and demolition projects, respectively (Table 2). Demolished sites such as the mosque and school covered a land area of 364.60 and 30.04 m2, respectively. The studied demolished industrial facilities covered a land area ranging from 204.60 to 2673.71 m2 while the one industrial complex had an area of 32408.64 m2 within the studied construction projects. The number of floors within the construction sites ranged from 5—12. The floor area for mixed residential and commercial project sites varied from 222.81 to 736.56 m2 for both the construction and demolition projects.

Table 2.

Key details of the studied construction and demolition projects within the Greater Dhaka area

Construction Projects (CP)
Survey Date
(dd.mm.yy)
Project Site ID Location Type Status (during survey) No. of Floors Land Area (m2)
10.02.23 CP A South Keraniganj Residential On going G + 7 334.80
10.02.23 CP B Keraniganj Residential On going G + 8 334.80
17.02.23 CP C Narayanganj Industrial complex On going G + 1 32,408.64
20.03.23 CP D Rupganj, Narayanganj Residential On going G + 5 200.88
20.03.23 CP E Rupganj, Narayanganj Residential On going G + 7 334.80
20.03.23 CP F Araihajar, Narayanganj Mixed (commercial cum residential) On going G + 7 736.56
26.05.23 CP G Gazipur Residential On going G + 9 401.76
26.05.23 CP H Gazipur Residential On going G + 8 301.32
26.05.23 CP I Gazipur Residential On going G + 7 200.88
26.05.23 CP J Gazipur Residential On going G + 9 368.28
26.05.23 CP K Gazipur Residential On going G + 10 511.50
15.07.23 CP L Savar Residential On going G + 10 535.68
18.07.23 CP M Sree Nagar, Munshiganj Residential On going G + 2 234.36
11.08.23 CP N Munshiganj Commercial On going B + G + 10 669.60
11.08.23 CP O Munshiganj Residential On going G + 4 222.81
11.08.23 CP P Munshiganj Mixed (commercial cum residential) On going G + 9 405.11
11.08.23 CP Q Munshiganj Mixed (commercial cum residential) On going G + 7 222.81
19.08.23 CP R Savar Residential On going G + 9 648.17
19.08.23 CP S Savar Residential On going G + 7 648.17
19.08.23 CP T Savar Residential On going G + 9 405.11
19.08.23 CP U Savar Residential On going G + 7 303.83
Demolition Projects (DP)
26.05.23 DP A Gazipur Residential On going Ground floor (tin shed) 468.72
26.05.23 DP B Gazipur Residential On going G + 5 401.76
15.07.23 DP C Savar Mosque On going Ground foor 364.60
15.07.23 DP D Savar Residential On going Ground floor (tin shed) 401.76
15.07.23 DP E Savar Residential On going G + 3 267.84
15.07.23 DP F Savar Residential On going Ground floor 334.80
18.07.23 DP G Munshiganj School On going G + 1 30.04
11.08.23 DP H Narayanganj Industrial (Textiles) On going G + 4 744.00
11.08.23 DP I Narayanganj Industrial (Textiles) On going Ground floor (tin shed) 204.60
15.08.23 DP J Morapara, Rupganj RCC water tank On going G + 2 202.55
15.08.23 DP K Morapara, Rupganj Industrial (Jute mill) On going Ground floor only 2673.71
19.08.23 DP L Savar Mixed (commercial cum residential) On going G + 1 648.17

CP – Construction project; DP – Demolition project; G – Ground floor; B – Basement; RCC – Reinforced cement concrete

Identification of WGR and recycling potential

The study employed a primary qualitative survey based on a structured questionnaire (Appendix 1) and quantitative assessment through on-site visit within the studied construction and demolition project sites. Field data involved gathering information on CDW produced during the construction, rehabilitation, and demolition of buildings at site. Numerous methodological procedures, including photographic recording, and demarcation of geographic coordinates, were used to characterize the study location. Additionally, different techniques were used for data collection such as: direct observation of the composition of CDW, sorting and weighing waste items from a representative area, gravimetric analysis, and field observations regarding waste management and disposal techniques/issues.

The primary data obtained through such assessment were utilized to determine the WGR of the construction and demolition sites. The study mainly considered concrete, brick, cement, metal (i.e., steel rod), and mortar as the main waste components of the studied construction and demolition sites. For the WGR of the demolition and construction sites, the following Eqs. (1) and (2) were used, respectively. The waste components, including concrete, brick, metal, and mortar, were collected in separate sealed zip-lock, clear plastic bags from the studied construction and demolition sites. These samples were then transported to a controlled laboratory environment, where they were precisely weighed and analyzed to determine their mass composition within ~ 24 h after the field survey and stored at room temperature (~ 25 °C) for subsequent physio-chemical analyses. The volume of each waste component was estimated based on standard volume calculations from field measurements, and the waste composition was assessed through sample analysis of a representative waste dumping area within the studied construction and demolition sites followed by the methodology described by Lu et al. (2011). The density of the individual waste items was obtained from reference material properties and verified through third-party lab testing. A detailed methodology of the applied WGR calculation is further described by Haque et al. (2024).

WGRDP=i=1NWMi/FA 1
WGRCP=i=1N(WVi×ρi×WCi)/FA 2

where,

WGRDP

Waste generation rate of the demolition projects (kg/m2);

WGRCP

Waste generation rate of the construction projects (kg/m2);

WMi

Mass of the ith waste component (kg);

WVi

approximate volume of the ith waste component (m3);

WCi

Composition of the ith waste component (%);

ρi

Density of the ith waste component (kg/m3);

FAi

Representative floor area (m2).

Recycling CDW components into new construction and rehabilitation work can help in the reduction of natural resource consumption, energy usage and landfill space in addition to the economic benefits (Yazdani et al., 2021). It can also help in the business development and employment creation aspects for a nation. In Australia, the recycling rate of CDW was reported to be 66.80% and in Singapore, this rate was found to be 99% for the concrete and masonry waste (Villoria-Sáez et al., 2020). Only in Queensland, the recycling rate was 50% in 2015 (Tuladhar et al., 2020). To identify the recycling potential of the generated CDW within the Greater Dhaka this study employed Eq. (3) to calculate the recycled amount of the studied waste components (Islam et al., 2019).

REi=WGRi×WCi×RCDWi 1

where,

REi

The maximum recycled amount of the ith CDW material (kg/m2);

WGRi

The waste generation rate of the ith CDW material from both construction and demolition projects (kg/m2);

WCi

The waste composition rate of the ith CDW material based on this study (%);

RCDWi

The maximum recycling rate for the ith CDW material (%).

Physio-chemical analysis

The CDW samples collected from the studied sites were used for Gravimetric Analysis. As the collected samples were commingled, the analysis was performed following a series of tasks. First, the samples were segregated and labeled according to the site codes. Then, the mortar was segregated from concrete and brick samples using a chisel and hammer carefully to avoid any sort of loss. Next, appropriate quantities of these samples were crushed using a crusher. The crushed and segregated samples were carefully weighed by using a mass balance. The volume of the sample was obtained by using the dimensions of a cuboidal container used for experimental purposes. Finally, these data were utilized to calculate the density and unit weight of the samples to understand their gravimetric composition. Additionally, the study employed a chemical characterization (pH and heavy metals) on waste brick and mortar samples taken from different construction and demolition sites which will enable to identify any human risk associated with the recycling of CDW (Table 3). Previous studies have shown that heavy metals can leach into the soil, posing environmental risks. For instance, studies conducted by Wu et al. (2022), and Balali et al. (2023) found that Cd poses the highest risk to the soil environment. Studies from Ullah et al. (2023) highlighted the effects of Cr and Landes et al. (2023) found Pb as major contaminants within soil from construction materials. Additionally, a significant correlation exists between soil pH and heavy metal levels as stated by Diotti et al. (2021).

Table 3.

Analyzed chemical parameters on the selected CDW samples

Parameters Method of analysis Instrumental method, brand and model of the equipment
pH USEPA 150.1; SM 4500-H + B pH meter, WTW, German
Cadmium (Cd) USEPA 213.2; SM 3113 B Atomic Absorption Spectophotometer, Shimadzu AA 7000, Japan
Lead (Pb) USEPA 200.9 REV. 2.2; SM 3111 B Atomic Absorption Spectophotometer, Shimadzu AA 7000, Japan
Chromium (Cr) SM 3113 B Atomic Absorption Spectophotometer, Shimadzu AA 7000, Japan

Calibration standards from HACH, USA, and SHIMADZU, JAPAN are used for standardization. To ensure QA/QC, the instructions stated in the test parameters standard procedure are followed

Results

Waste generation rate

Figure 2 illustrates the average WGR of different CDW components from the 21 construction and 12 demolition projects of different parts of the Greater Dhaka Region. Since each construction project has a different design and occupancy purpose, the material requirements were also different. Hence, the WGR of construction as well as the demolition sites varied from site to site (Kitchenham & Pfleeger, 2002). The total WGR for the demolition projects (DP) was found to be approximately 463.67 kg/m2, where 40.57% of waste is from the concrete followed by brick (28.28%), mortar (13.23%) and cement (10.93%). On the other hand, the WGR from the construction projects was calculated to be 90.31 kg/m2 of which 41.12% is contributed by the concrete followed by brick (28.79%) and mortar (13.01%). The variation in the data suggests that the WGR is dependent on various factors such as construction type, building size, construction pattern, and measurement approach, among other factors (Parisi Kern et al., 2015; Wang et al., 2020). Arshad et al. (2017) reported that bricks (6.82%), tiles (6.68%), plaster (6.63%), and wood (6.41%) are the major waste components in the construction sector of Pakistan where project management followed by the handling of material are the major factors in the waste generation. In the Bengaluru City of India, the WGR of construction and demolition activities were reported to be 5.72 and 57.55 kg/m2, respectively (Abhishek & Joshi, 2022) and in Mumbai, the total CDW amount was around 0.91MT in 2022 (Swetha et al., 2022). In Chile, the WGR was reported to be 186 kg for per m2 of constructed floor area by Bravo et al. (2019).

Fig. 2.

Fig. 2

The waste generation rates of the studied construction and demolition projects of the Greater Dhaka region (2022–2024)

The northern region of Dhaka city is expanding due to the concentration of several industrial and residential zones starting from Mirpur, and Ashulia, to Tongi, Gazipur, Narayanganj, Rupganj and Konabari. The industries in the areas of Aminbazar, Savar, Nabinagar, and Manikganj are expanding in the northwest. The construction of private universities in the regions of Purbachal, Ashulia, Bashundhara, Savar, and Gazipur is accelerating urban expansion. According to Karim (2021), between 2000 and 2010, the urban area around Dhaka grew from 79.74 km2 to 99.23 km2, marking a net increase of 6.39%. Similarly, from 2010 to 2020, Dhaka's urban area increased from 99.23 km2 to 133.52 km2, reflecting a net growth of 11.25%. Wang and Sarker (2020) analyzed the built-up area increment rate within the Greater Dhaka from 1990 to 2017 considering its rapid and ever-growing residential and industrial development. Based on these reported results the present study projected built-up land area from 2018 to 2030 for the major eight districts – Dhaka City, Gazipur, Savar, Narayanganj, Keraniganj, Bandar, Rupganj and Sonargaon – of the Greater Dhaka Region (Appendix 2). Based on the change in land use pattern and built-up land area, the current study further calculated the total construction and demolition floor area for these eight districts considering a yearly growth rate of real estate sector as 8% for the whole nation (Appendix 3). Considering the average WGR of 463.67 kg/m2 and 90.31 kg/m2 for the construction and demolition projects of the Greater Dhaka Region, the present study also evaluated the WGR of the total CDW in these eight districts from years 2022 to 2030 (Table 4). It has been found that the highest increase in terms of CDW will be at Savar following its highest land area conversion to industrial and residential hubs within the Greater Dhaka followed by Rupganj. As indicated earlier that the built-up area is expanding to the surrounding parts of the Dhaka city, the current analysis also confirms that the CDW amount will be growing proportionally within the region in this timeframe.

Table 4.

Projected increase in the CDW in the major eight districts of the Greater Dhaka area from 2022 to 2030

Construction waste (MT)
2022 2023 2024 2025 2026 2027 2028 2029 2030
Dhaka city 0.34 0.36 0.39 0.42 0.46 0.49 0.53 0.58 0.62
Gazipur 0.59 0.80 1.12 1.60 2.34 3.45 5.14 7.71 11.60
Savar 1.50 2.92 5.89 12.05 24.87 51.54 107.01 222.40 462.40
Narayanganj 0.42 0.55 0.73 1.02 1.45 2.09 3.07 4.55 6.79
Keraniganj 0.31 0.37 0.48 0.64 0.89 1.28 1.88 2.81 4.24
Bandar 0.30 0.37 0.49 0.68 0.98 1.47 2.26 3.53 5.56
Rupganj 0.43 0.65 1.06 1.84 3.32 6.11 11.38 21.35 40.18
Sonargaon 0.30 0.41 0.60 0.96 1.63 2.85 5.12 9.31 17.05
Demolition waste (MT)
2022 2023 2024 2025 2026 2027 2028 2029 2030
Dhaka city 0.52 0.56 0.60 0.65 0.70 0.76 0.82 0.88 0.95
Gazipur 0.87 1.19 1.67 2.41 3.53 5.23 7.81 11.72 17.65
Savar 2.26 4.43 8.94 18.34 37.88 78.53 163.10 339.00 704.80
Narayanganj 0.62 0.81 1.09 1.52 2.18 3.16 4.65 6.91 10.32
Keraniganj 0.44 0.54 0.70 0.95 1.33 1.92 2.84 4.25 6.43
Bandar 0.43 0.54 0.72 1.01 1.47 2.22 3.42 5.35 8.45
Rupganj 0.62 0.95 1.59 2.78 5.03 9.28 17.32 32.51 61.21
Sonargaon 0.44 0.60 0.89 1.44 2.45 4.32 7.78 14.16 25.97

MT – million tonnes

Physio-chemical properties

Table 5 shows the results of the density of the selected CDW materials collected from the studied 15 construction and 12 demolition sites. From the gravimetric analysis, the mean density values of brick, mortar and RCC were found to be 1691.69 kg/m3, 2029.80 kg/m3, and 2357.55 kg/m3, respectively. The waste brick, mortar, and RCC from the demolition projects have average density values of 1525.16 kg/m3, 1832.99 kg/m3, and 2161.74 kg/m3, respectively.

Table 5.

Gravimetric analysis results of the selected waste materials from the studied construction and demolition sites

Density of Construction Waste (kg/m3)
Sampling Sites Brick Mortar RCC
CP G 1384.21 1869.66 -
CP H 1465.20 1964.29 -
CP I 1696.83 2121.91 -
CP J 1925.13 2308.27 -
CP K 1801.80 2289.67 2346.81
CP L 1487.64 2233.85 -
CP M 1680.49 1923.08 2418.15
CP N 2034.78 2048.01 -
CP O 1686.91 1838.24 2188.55
CP P 1795.74 2091.13 2523.49
CP Q 1527.47 2075.47 2395.47
CP R 1920.73 1862.37 2278.07
CP S 1762.52 2010.94 2353.59
CP T 1449.28 1815.15 2306.44
CP U 1756.64 1994.95 2407.41
Avg 1691.69 2029.80 2357.55
Std. error 50.25 41.12 31.79
Density of Demolition Waste (kg/m3)
DP A 1525.55 1854.04 -
DP B 1498.72 1707.21 -
DP C 1512.10 1757.86 1959.75
DP D 1493.93 2266.01 2574.77
DP E 1731.60 1906.32 2487.56
DP F 1753.16 2309.88 2292.77
DP G 1757.98 2006.17 2481.39
DP H 1616.03 2198.89 2400.96
DP I 1699.01 1981.87 2477.48
DP J 1863.14 - 2261.16
DP K 1611.11 - 2268.86
DP L 1547.99 1936.66 2346.84
Avg 1525.16 1832.99 2161.74
Std. error 117.54 171.64 198.95

The pH value of brick-and-mortar samples collected from both construction and demolition sites mostly ranges from 6.50—10.0 (Table 6). The mean pH value of waste brick samples from construction sites was found to be 7.56 whereas the mean pH value is 7.70 for waste brick samples at the demolition sites. However, the mean pH value for mortar samples is 8.67 at the construction sites which has reduced to 7.92 at the demolition sites.

Table 6.

The pH value of the commonly found construction and demolition waste materials from different studied sites

Construction Waste
Sampling Site Brick Mortar
CP A 6.50 10.00
CP B - -
CP C 7.00 10.00
CP D - -
CP E 7.00 7.00
CP F - -
CP G 8.00 8.50
CP H 7.50 9.00
CP I 8.00 8.00
CP J 8.00 9.00
CP K 8.00 8.00
CP L 7.50 7.50
CP M 8.00 9.00
CP N 7.00 7.00
CP O 8.00 8.50
CP P 7.00 9.00
CP Q 8.00 8.50
CP R 8.00 10.00
CP S 7.50 9.00
CP T 7.50 10.00
CP U 7.50 8.00
Avg 7.56 8.67
Std. error 0.11 0.23
Demolition Waste
Sampling Site Brick Mortar
DP A 7.50 9.00
DP B 8.00 7.00
DP C 8.00 7.00
DP D 7.00 7.00
DP E 7.50 7.50
DP F 8.00 7.50
DP G 8.00 10.00
DP H 8.00 7.50
DP I 8.00 8.00
DP J - 10.00
DP K - 7.50
DP L 7.00 7.00
Avg 7.70 7.92
Std. error 0.13 0.32

Environmental implications of heavy metal

The representative heavy metal content analysis from both construction and demolition waste samples is summarized in Table 7. The Pb concentration in mortar samples from construction sites ranges from 0.179 to 0.236 mg/L whereas at demolition sites this concentration ranges from 0.160 to 0.189 mg/L. The Pb concentration level was found to be much lower than the recommended level of US EPA (5.0 mg/L). Also, the Cd concentration levels in the analyzed samples did not exceed the maximum level by US EPA (1.0 mg/L). In the waste mortar sample from sampling site CP R (Table 5), the Cr concentration is found to be 0.089 mg/L which does not exceed the US EPA standard of Cr in soil (5.0 mg/L). In Skopje City (in the Republic of Macedonia), the Cr concentrations were found to be higher in the majority of the CDW samples than the recommended level by the Italian standard (Bianchini et al., 2020). Based on the heavy metal analysis results of this current study, the recycling of CDW material will be safe in terms of their health implications in the Greater Dhaka region.

Table 7.

The analyzed heavy metal content test results of selected construction and demolition projects

Analyzed Metal Content Construction Projects Demolition Projects Minimum Detection Level (MDL) US EPA Guideline Value Analytical Method
CP I (Brick) CP I (Mortar) CP R (Brick) CP R (Mortar) DP B (Brick) DP B (Mortar) DP F (Brick) DP F (Mortar)
mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L
Lead (Pb)  < MDL 0.236  < MDL 0.179  < MDL 0.160 0.151 0.189 0.010 5.00 USEPA 200.9 Rev 2.2; SM 3111 B
Cadmium (Cd)  < MDL  < MDL  < MDL  < MDL  < MDL  < MDL  < MDL  < MDL 0.001 1.00 USEPA 213.2; SM 3113 B
Chromium (Cr)  < MDL  < MDL  < MDL 0.089  < MDL  < MDL 0.007  < MDL 0.001 5.00 USEPA 200.9 Rev 2.2; SM 3111 B

Recycling potential identification

It is well-established that approximately 70% of concrete and mortar waste can be recycled by converting into aggregates (Letelier et al., 2017; Mohammed et al., 2019), whereas for bricks and metals, 80% and 100% recycling can be achieved, respectively (Zhu & Zhu, 2020). Considering these values to be the optimum recycling rates, the present study identified the recycling potential of the most found CDW materials – cement, brick, metal, concrete, and mortar—for construction and demolition projects in the context of the Greater Dhaka Region (Fig. 3). For per m2 demolition activities, 53.41 kg of concrete waste can be recycled followed by 29.67 kg of brick waste for further usage. For construction projects, the recycling potential of concrete and brick waste materials is 10.69 kg/m2 and 5.99 kg/m2, respectively. A statistically significant correlation (r = 0.97; p < 0.05) is observed between the construction and demolition waste generation rate and its recycling potential.

Fig. 3.

Fig. 3

Recycling potential of the commonly found CDW materials in the Greater Dhaka region

Analysis of economic benefits

In the present study, an economic benefit analysis was conducted considering the growth of the construction and demolition footprint in the study areas between 2022 and 2030. The identified recycling potential (REi) values for each of the CDW items were used to calculate their recycled amount. Following that, the recycling values of those CDW materials were used to calculate the financial outcome that can be expected by recycling the CDW materials for the studied years. The recycling value of the studied CDW items was collected through a field-based survey at different salvage yards in Dhaka City as given in Appendix 4. The total economic benefits of the waste from both construction and demolition projects were assessed based on the combined values of the studied waste materials for the respective years. For instance, Savar exhibits the greatest potential for economic benefits, projected to reach 2319.54 million USD by 2030 for DP and 1287.71 million USD for CP, significantly exceeding the other cities studied (Fig. 4c). Rupganj demonstrates significant potential, projecting 201.47 million USD for the demolition and 111.89 million USD for construction projects by 2030. Dhaka City, although less than Savar and Rupganj, demonstrates significant potential, with projected values of 3.14 million USD for DP and 1.73 million USD for CP by 2030. In 2025, the DP and CP of Savar are projected to generate 60.36 million USD and 33.56 million USD, respectively, whereas Rupganj's DP and CP are expected to yield 9.14 million USD and 5.13 million USD, respectively. By 2027, the demolition and construction projects of Savar may reach 258.45 million USD and 143.53 million USD, respectively, whereas Rupganj's DP and CP could amount to 30.55 million USD and 17.01 million USD, respectively. Gazipur, Narayanganj, Keraniganj, Bandar, and Sonargaon exhibit potential for economic benefits, although to a lesser degree than the other regions investigated.

Fig. 4.

Fig. 4

Total economic benefits from recycling waste materials from both demolition and construction projects—a. Dhaka, b. Gazipur, c. Savar, d. Narayanganj, e. Keraniganj, f. Bandar, g. Rupganj and h. Sonargaon – in the studied regions of Greater Dhaka from the years 2022 to 2030. Note: 1.00 USD = 117.20 BDT (as of Jul 06, 2024; Source: https://www.forbes.com/advisor/money-transfer/currency-converter/usd-bdt/)

The economic benefit from recycling metal waste from demolition projects is recorded to reach around 947,670 USD by 2030 in Dhaka (Appendix 5: Figure 7) whereas in Narayanganj this figure will be around 21.52 million USD. Similarly, the economic benefit is recorded for the construction projects (Appendix 5: Figure 8). By 2030, the economic benefits achieved by recycling brick and concrete waste into aggregates from the construction projects within Keraniganj are around 6.52 million USD and 803,950 USD, respectively. In Rupganj, the recycling and reusing of brick and concrete from the constructed floor areas into new construction projects will result in savings of around 41.37 million USD and 7.63 million USD by 2030, respectively. A significant increase in the economic benefit also confirms the fact that the urban sprawl is growing at a substantially faster rate within the adjacent districts of Dhaka city due to the change in land cover and rapid growth in the construction and demolition activities.

Fig. 7.

Fig. 7

Economic benefit analysis from recycling CDW from demolition projects in the Greater Dhaka Region –a Dhaka; b Gazipur; c Savar; d Narayanganj; e Keraniganj; f Bandar; g Rupganj; h Sonargaon. Note: 1.00 USD = 117.20 BDT (as of Jul 06, 2024; Source: https://www.forbes.com/advisor/money-transfer/currency-converter/usd-bdt/)

Fig. 8.

Fig. 8

Economic benefit analysis from recycling CDW from construction projects in the Greater Dhaka Region –a Dhaka; b Gazipur; c Savar; d Narayanganj; e Keraniganj; f Bandar; g Rupganj; h Sonargaon. Note: 1.00 USD = 117.20 BDT (as of Jul 06, 2024; Source: https://www.forbes.com/advisor/money-transfer/currency-converter/usd-bdt/)

Discussion

Environmental implications and management

In Bangladesh, the Building Construction Regulations 2008 and the Bangladesh National Building Code 2020 encourage sustainable construction practices (BNBC, 2020). The environmental implications of CDW are becoming a pressing issue in urban waste management. However, no legislation encourages the use of recycled CDW in new construction and rehabilitation projects. UNEP (2015) indicated that CDW is a large source of total solid waste generation (estimated at 36% by weight) worldwide but receives significantly less attention in terms of its management. This is partially explained by the fact that the components of CDW are harmless but largely differentiated as relatively high-density materials (Cook et al., 2022). Furthermore, as waste is typically produced during normal business hours, a large portion of the detrimental effects on the environment or public health occur behind the public view (Cook et al., 2022).

Several studies found that CDW is a serious environmental concern and has long-term consequences such as increasing pollution, resource depletion, and land deterioration (Ding et al., 2023; Islam et al., 2019). According to Islam et al. (2019), despite a lack of evidence, there is a strong indication that the combustible fraction of construction and demolition waste is disposed of by open burning in many low- and middle-income countries, including increasing amounts of high chloride-content PVC, putting people at risk of exposure to dioxins and other compounds. The findings of the present study indicate that unsafe working conditions at the CDW sites pose serious hazards to both the workers and the environment.

In Bangladesh as naturally occurring stone aggregates are hard to find, clay-burnt bricks are used as construction material. Approximately 7000 brick kilns, including 1000 near Dhaka, are privately operated in the country to meet the demand for bricks (Haque et al., 2022). The brick manufacturing industry is anticipated to grow at a pace of 6% per year during the next ten years (WB, 2012). Previous studies have highlighted the air pollution issues connected with the brick (Haque, 2019; Haque & Sharif, 2021) and cement manufacturing (Nayeem et al., 2022; Rahman et al., 2015) processes as well as the soil pollution from particulate emissions within the Greater Dhaka area (Haque et al., 2022). Specifically, in Dhaka, many workers are classed as informal, resulting in an unregulated and vulnerable workforce who are at high risk of exposure to hazards. An efficient management and recycling practice of CDW will help to lower the negative environmental issues of this region.

Waste management and recycling

For efficient waste management, infrastructure development, and relevant policy formulation, waste quantification is the fundamental step (Akhtar & Sarmah, 2018; Haque et al., 2021). Through extensive fieldwork, this study has computed the CDW generation rate within the Greater Dhaka area and projected WGR from 2022 to 2030 considering the changes in land cover and usage over the years. The findings suggest that large quantities of concrete waste (~ 41%) are produced during construction and demolition activities, which is one of the most widely used construction materials. The concrete production process contributes to carbon emissions and waste generation. Concrete recycling involves crushing and reusing concrete waste instead of disposing of it in landfills. This circular strategy is expected to curb both waste generation and carbon emissions while protecting natural resources (Küpfer et al., 2023). Recycling other CDW materials can also lower construction costs and create job opportunities in the construction and recycling industries. In this regard, the recycling potential identified for each of the waste components in this study is expected to aid in deriving relevant policy measures to establish an efficient CDW recycling industry can be established.

Recycling CDW is not a new concept, and reclaimed concrete, mortar, and bricks from the crushing process are utilized as a road foundation in road structures all over the world, including China, Japan, Turkey, many European countries, and the United States (Akbas et al., 2020; Aurstad et al., 2006; Li, 2008; Mahdi, 2017). Recycling rates are found to be 47% (in France), 75% (in Italy), more than 65% (in Germany and Belgium), and 86% (in the UK) (Zheng et al., 2017). For instance, reclaimed concrete works effectively as a filler in sound-absorbing embankments and as a material for cut-off layers, main foundations, and auxiliary foundations (Stępień & Maciejewski, 2022). The usage of reclaimed concrete and mortar aggregates in various elements of structural applications has been demonstrated to be effective with some types of adjustments in their mix design and other improvements (Xiao et al., 2022, Nwakaire et al., 2020, Rahaman et al. (2020) studied that the shortage of road construction materials in Bangladesh and found that pavement recycling has not yet become widespread, thus construction and maintenance rely heavily on imported virgin construction materials, although recycled CDW materials have been used in the pavement construction for many decades in industrialized countries.

In the Greater Dhaka area, CDW is typically disposed of in designated landfill sites—Matuail (North Dhaka) and Aminbazar (South Dhaka)—and other open spaces depending on the location of construction and demolition sites. Findings reveal that numerous plans are being considered regarding Dhaka city's eastward expansion across the Balu and Sitalakshya rivers (Roy et al., 2019; Siddiqui, 2024). As of January 2024, field observation indicates that many areas of this region are already being developed rapidly and haphazardly at an alarmingly rapid pace. Private developers are buying property and filling up low-lying flood plains, rivers, canals, and other water bodies with sand and CDW to build and sell new residential and commercial plots (Fig. 5). Other viable options for the city’s horizontal growth include expanding across the Buriganga River to Keraniganj and beyond to Mawa, or to the southwest across the Padma River to Shariatpur and Madaripur, supported by new infrastructure developments such as the newly constructed Padma Bridge, a multipurpose road-rail bridge that is also one of the largest infrastructure projects in the country’s history (Rashid et al., 2023). In the future, to achieve sustainability, in addition to residential and commercial properties, highway and bridge construction projects can explore the use of recycled materials instead of imported alternatives (Martínez-Muñoz et al., 2021). Furthermore, the authors suggest that in-place recycling-repaving of aggregates used in road rehabilitation and maintenance works in the country can be a practical solution to ongoing and future material demand.

Fig. 5.

Fig. 5

Wetlands being filled with CDW and sand by private developers to construct residential and commercial plots and infrastructures (from different parts of the Greater Dhaka area)

In both developed and developing countries, the waste management hierarchy based on the 3R principle (Fig. 6) provides the foundation for the circular economy approach within the construction industries (Ogunmakinde et al., 2022). Through the 3R approach, the industry’s environmental sustainability is enhanced by reducing natural resource consumption by recycling construction materials and minimizing the waste loads from getting into landfills (Guerra et al., 2019; Suthar et al., 2016). Table 8 shows the best management practices that can be achieved in the context of Bangladesh for efficient CDW management in different stages of construction activities.

Fig. 6.

Fig. 6

The waste management hierarchy (adapted after Purchase et al., 2022)

Table 8.

The best management practices that can be achieved in different stages of the construction activities

Stages Causes of waste Best management practices
Design Design alteration, design and detailing errors, miscommunication of client and real estate, unclear specifications, etc

• The design stage should have the flexibility to accommodate future design alterations;

• Building shape and form should be selected in such a way that it reduces the use of excess construction material and generates minimal waste

Procurement Ordering errors, supplier errors, over allowances (difficulty in ordering a product in small quantity) • Awareness build-up training and educational programs for the construction workforce about efficient ways to minimize waste generation
Transportation Inefficient loading and unloading methods, damage during transportation, difficulty in accessing construction sites • Usage of selective building demolition plans and supervision of the proper implementation of the waste sorting and transportation plans
On-site management and planning Lack of and improper onsite management plans, lack of supervision, improper planning for the required quantity of construction material

• Identification of all potential waste and development of specific actions for every type of waste produced, including their reuse and recycling opportunities;

• Segregation and handling of mono-fractional waste streams whenever feasible;

• Monitoring both on- and off-site waste management practices and the promotion of adequate communication between key stakeholders for efficient CDW management operations

Material storage and handling Improper and insufficient site storage, materials stored at a considerable distance from the point of application, materials supplied in loose form (bricks, sand, glass)

• Encouragement of appropriate material handling and storage procedures to prevent material loss through appropriate logistics;

• Planning of supply chain management effectively to control material stocks

Site operation Unused materials and products, equipment malfunction, poor craftsmanship, use of wrong materials resulting in their disposal, time pressure

• Encouragement of off-site construction, employment of prefabricated components, precast beams, contemporary building techniques, and the rental and reuse of auxiliary equipment;

• Maximising material recovery at the end of its useful life: use of fewer distinct materials and parts;

• Use of materials that are simple to separate and standard size

Waste/Residual Packaging, over-preparation of materials, off-cuts from cutting materials to a specific length/shape

• Ensuring proper usage and maintenance of technical equipment required in waste sorting, transport, and disposal operations;

• Awareness building programs among key stakeholders about the economic and environmental benefits of construction and demolition waste valorization approach

Source: based on Oliveira et al. (2021); Esa et al. (2017); Fatemi (2012)

Business development, policy implications, and achieving sustainable development goals (SDGs)

As Bangladesh is progressing toward its graduation from the United Nations’ list of Least Developed Countries by 2026, there is large potential for CDW management. Effective CDW management and recycling practices can bring significant environmental, economic, and social benefits. The recycling potential and economic benefits associated with the studied waste components of this study will help to devise the public–private partnership (PPP) that can lead to the establishment of large-scale recycling facilities to enhance CDW management infrastructure. Key actors in this field include facility owners, contractors, demolition companies, recycling firms, and all the concerned persons contributing to the shared goal of minimizing waste and promoting recycling. In Sweden, there’s been progress in establishing new rules for CDW management driven by environmental managers within large construction and demolition companies with the help of the government. Their efforts have led to collaborative projects aimed at overcoming recycling barriers (Andersson & Buser, 2022). It's essential to implement well-designed penalties, subsidies, and financial support policies to ensure consumer demand for recycled products that influence the evolution of CDW management facilities. Penalties are effective in curbing the behaviors of non-cooperative recyclers and increasing the availability of recycled products in the market (Lu et al., 2022).

Another approach to achieve better CDW management (which particularly requires a policy-level mechanism) is adopting a Circular Economy (CE) approach. Originating from ideas by Boulding (1966) and Pearce and Turner (1990), CE aims to preserve natural resources, maximize material value, and design production systems for closed-loop material and energy flows. This approach is encouraged by the principles of the 3R and supported by concepts such as Industrial Ecology and regenerative design (Oliveira et al., 2021). The promotion of the CE business model can result in economic and environmental benefits, including resource conservation, waste valorization, job creation, reduced energy consumption, and decreased greenhouse gas emissions. This also enhances business and community resilience by reducing reliance on long-distance supply chains. In developing countries, the adoption of the CE model is still in the primary stage. With improved policies and laws, strategies that combine social aspects, establish a market for CDW reuse and recycling, ensure safe disposal, and enforce strict supervision can positively transform CDW management in Bangladesh through the CE approach. Moreover, digitization tools (i.e., Building information modelling, green building practices, digital twins, GIS, cloud-based waste tracking and on-site management, sustainable supply chain management, and automated construction system) play a key role in the construction industry's efforts (Daoud et al., 2020) to achieve zero waste and CE by recovering, reusing, and recycling material and enable businesses to easily monitor the number of materials utilized on each project, allowing for more effective resource management. In Bangladesh, the adoption of digital technology was propelled by the government’s determined attempts to meet national and sustainable development objectives. Real estate development companies in Dhaka have long included digitalization; new building construction already makes extensive use of different types of software, which can generate visualizations such as computer-aided design and BIM. The local CDW industries can incorporate various construction management software to streamline reuse and recycling processes to optimize resource utilization. For example, digitalization tools can provide real-time, secure access to centrally managed data to project participants which lowers the risk of errors and improves project management and collaboration. Additionally, access to affordable digital technology (i.e., a national database regarding the waste composition, volume, and recycling potential from projects), can allow workers to minimize the environmental impact of CDW while making more informed decisions. A more specific and actionable policy recommendation for the development of sustainable construction practices and the establishment of recycling facilities for CDW management in Greater Dhaka has been summarized in Table 9.

Table 9.

Identification of barriers and actionable measures for the efficient CDW management in the Greater Dhaka area by the responsible agencies

Challenges/Limitations Proposed Recommendations Responsible Agencies

Regulatory and political

• Lack of strict enforcement of waste management policies and regulations in Bangladesh

• Absence of mandatory requirements for recycling of waste in construction and demolition projects

• Limited government intervention and enforcement in promoting sustainable construction practices

• Bureaucratic challenges and lack of political awareness in establishing recycling facilities and integrating CDW into actionable waste management plans

Legislative measures to promote the CDW recycling

• Introduction of legal requirements for construction companies to recycle a minimum percentage of CDW materials in new development projects

• Enforcement of legislative measures where developers and contractors are accountable for the proper disposal and recycling of waste generated during construction and demolition activities

• Implementation of stricter guidelines on landfill disposal to discourage illegal dumping and promotion of recycling practices

DoE, PWD, City management authorities (i.e., RAJUK), and LGED

Financial

• High initial investment costs for the establishment of CDW recycling plants and infrastructure

• Limited resources or access to government funding for businesses that promote recycled materials

• Lack of market demand for recycled construction materials, discouraging private sector investment

• Higher costs of processing recycled materials compared to sourcing virgin materials and ignoring environmental issues associated with those items

Financial incentives and market development

• Promotion of financial incentives for private companies that use recycled construction materials or investment in CDW recycling infrastructures

• Encouragement of collaboration between government agencies and private industries (PPP) for the development of CDW recycling plants and formal markets for recycled materials

• Enforcement of using certain percentage of recycled materials in public construction projects to create a market demand

DoE, PWD, City management authorities (i.e., RAJUK), LGED, public and private construction sector

Technological

• Limited availability of advanced recycling technologies for processing solid waste as well as CDW efficiently

• Lack of technical expertise and skilled workforce in handling and processing recycled waste materials

• Poor quality control and standardization of recycled aggregates, affecting their acceptance in construction

• Need for research and development to enhance the durability and usability of recycled materials in large-scale infrastructure projects

Improving data collection and waste tracking

• Development of national database where construction bodies update on CDW generation, disposal, and recycling activities in the projects

• Assessment of waste composition, volume, and recycling potential through mandatory periodic audits for urban development projects

• Inclusion of waste management as a major component of city planning to ensure efficient waste processing and recycling facilities in high-growth areas

• Arrangement of technical training programs for construction professionals on sustainable building materials and waste management strategies

• Promotion of education and outreach programs to encourage sustainable construction practices among developers, contractors, landowners and public

MoPSID of GoB, public and private construction sector

The primary aim of the United Nations Sustainable Development Goals (SDGs) is to create a balance between environmental protection and development at all phases. As the construction industry helps a nation's economic growth, it has a responsibility to prevent environmental deterioration, and many of the SDGs are closely connected to this sector. Specifically, Target 11.6 focuses on reducing the negative effects of cities on the environment per person by 2030, particularly by focusing on air quality and managing municipal and other waste. While sustainable construction practices are prevalent in industrialized nations, the proportion of eco-friendly projects in underdeveloped nations is far smaller. Table 10 presents a few of the notable SDGs concerning the CDW sectors regarding the environment and global climate change issues.

Table 10.

Relevant SDGs connected with the sustainability of the construction industry

Goals Topic Way to achieve
SDG 6 Clean water and Sanitation • The construction industries need to take the appropriate precautions against the potential contamination of freshwater bodies around their premises. Additionally, they need to ensure that waste is not disposed of in the neighboring water body
SDG 9 Industry, Innovation, and Infrastructure • Construction companies need to assess the social and environmental risks posed by CDW and assess how they can minimize them. Encouraging innovation in waste reduction techniques and technologies can result in construction processes, which are both eco-friendly and productive
SDG 11 Sustainable Cities and Communities

• Minimizing construction waste reduces the pressure on local waste management systems in urban areas. Implementing recycling and waste reduction measures in construction projects fosters sustainable urban development

• Strategies to reduce construction waste can enhance resource efficiency and promote the use of recycled materials, contributing to greener cities

SDG 12 Responsible consumption and production • Promoting waste reduction in construction aligns with the goal of sustainable consumption and production. Adopting circular economy principles in construction can reduce the extraction of raw materials and minimize landfill waste
SDG 13 Climate action • By using energy-efficient procedures, cutting waste production, and integrating renewable energy sources, construction supply chains can lower their GHG emissions

This study offers a data-driven, field assessment of waste generation in a rapidly growing urban region of Bangladesh, which could function as a model for other developing countries encountering similar problems with CDW management. The study identifies key barriers in Table 9, providing a working framework for policymakers in South Asia and other developing regions to formulate context-specific CDW recycling policies. The findings may also enhance international initiatives such as SDGs 9, 11 and 12 by advancing resource efficiency and CE principles. This study's insights are expected to help global organizations such as the UN-Habitat, the World Bank, and the International Solid Waste Association (ISWA) in developing waste management strategies specifically designed for emerging and developing economies.

Conclusion

The present study was carried out to investigate WGRs of CDW in the Greater Dhaka area of Bangladesh from 21 construction and 12 demolition sites, along with the recycling potential of the studied waste components for the eight major districts of this region. Efforts to protect the environment from land disposal of CDW were investigated as well. Research findings show that the WGR for demolition and construction sites is found to be 463.67 kg/m2 and 90.31 kg/m2, respectively. The major components in CDW are mainly composed of concrete, brick, and mortar in both construction and demolition sites. From the physio-chemical analysis of the selected samples, the heavy metal concentrations of Pb, Cd, and Cr do not exceed standards set by the US EPA which suggests that the waste components are safe regarding future handling for recycling and reuse. Additionally, the findings indicate that the WGR and the recycling potential of CDW are statistically significant (r = 0.97). The economic benefit analysis of recycling CDW showed that the most profit can be generated from metal > brick > concrete waste components from both construction and demolition sites. In addition, the study offers a discussion on efficient CDW management, recycling and recovery of waste components as well as business development through the 3R and CE approaches. This study uniquely contributes to the existing knowledge on CDW management by concentrating on the Greater Dhaka area, utilizing a longitudinal analysis, employing a multifaceted methodology, conducting a comprehensive economic benefit analysis, and highlighting business development and policy implications. The findings are expected to assist legislators, urban planners, engineers and the overall construction sector in incorporating recycling facilities into municipal development strategies. By addressing the identified challenges (economic, technological, and regulatory), participating agencies can advocate for regional collaborations through a multi-stakeholder approach, supporting the construction industry's transition toward sustainable development.

Acknowledgements

The authors gratefully appreciate NSU for the continued research funding support. The authors greatly appreciate all the assistance provided by M. Z. As-Salek and M. M. Razin and all other project participants for their kind cooperation and valuable input.

Abbreviations

BIM

Building Information Modeling

CDW

Construction and Demolition Waste

CE

Circular Economy

CP

Construction project

DoE

Department of Environment

DP

Demolition project

EU

European Union

GHG

Greenhouse Gas

GIS

Geographic Information System

GoB

The Government of Bangladesh

ISWA

International Solid Waste Association

LGED

Local Government Engineering Department

MoPSID

Ministry of Planning, Statistics and Informatics Division

MSW

Municipal Solid Waste

PPP

Public-Private Partnership

PVC

Polyvinyl Chloride

PWD

Public Works Department

RAJUK

Rajdhani Unnayan Kartripakkha

RCC

Reinforced Cement Concrete

SDGs

Sustainable Development Goals

US EPA

The United States Environmental Protection Agency

WGR

Waste Generation Rates

Appendix 1

graphic file with name 10661_2025_14081_Figa_HTML.jpg

Appendix 2

Table 11

Table 11.

Projected increase in land area from years 2018–2030 in the studied eight districts of Greater Dhaka area

Projected land area in every year (2018–2030) in m2
Districts 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Dhaka city 170882483.95 194867022.5 222217956.9 253407784 288975319.4 329535004.2 375787521.2 428531899 488679315 557268836.8 635485372.5 724680139.9 826394009.8
Gazipur 132812610.43 201498623.4 305706627.5 463807348 703672202.3 1067586727 1619705050 2457359559 3728219532 5656323604 8581575317 13019664376 19752977070
Savar 121892661.88 253546433.8 527396753 1.097E + 09 2281903855 4746541553 9873184038 20537008253 42718610973 88858109,269 1.84832E + 11 3.84465E + 11 7.99718E + 11
Narayanganj 80423957.95 121556343 183725657.2 277691121 419714696.7 634375439.2 958823222.1 1449208015 2190397378 3310663910 5003884515 7563093363 11431195313
Keraniganj 38100332.12 58842128.41 90875745.24 140348442 216754044.2 334754806.3 516995107.4 798446911.2 1233120896 1904431118 2941202192 4542390773 7015265386
Bandar 30940947.76 49783788.27 80101798.87 128883285 207372386.6 333660851.9 536858189.8 863801414.8 1389850986 2236261401 3598130379 5789368908 9315057772
Rupganj 33,372,356.78 63064224.07 119173374 225203644 425570575.5 804206856.3 1519721299 2871839263 5426956087 10255397212 19379772066 36622234865 69205565572
Sonargaon 18388708.95 33,984,383.6 62806928.54 116074204 214518065.6 396453293.7 732689872.4 1354092544 2502513938 4624924669 8547376246 15796503927 29193699814

Calculated after Wang and Sarker (2020)

Appendix 3

Table 12

Table 12.

Estimated total construction and demolition floor areas in the studied eight districts of Greater Dhaka from years 2018–30

Construction floor area (m2)
Districts 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Dhaka city 2734415 2953168 3189421 3444575 3720141 4017753 4339173 4686307 5061211 5466108 5903397 6375668 6885722
Gazipur 2850001 3289591 3956522 4968367 6503502 8832555 12366112 17727101 25860605 38200471 56922082 85325852 1.28E + 08
Savar 2780113 3622697 5375339 9020974 16604185 32377866 65188378 1.33E + 08 2.75E + 08 5.71E + 08 1.18E + 09 2.46E + 09 5.12E + 09
Narayanganj 2514713 2777961 3175844 3777223 4686174 6060003 8136469 11274931 16018543 23188249 34024861 50403798 75159650
Keraniganj 2243842 2376590 2581605 2898230 3387226 4142431 5308769 7110060 9891974 14188359 20823,94 31071301 46897698
Bandar 2198022 2318616 2512652 2824853 3327183 4135429 5435892 7528329 10895046 16312073 25028034 39051961 61616370
Rupganj 2213583 2403611 2762710 3441303 4723652 7146924 11726216 20379771 36732519 67634542 1.26E + 08 2.36E + 08 4.45E + 08
Sonargaon 2117688 2217500 2401964 2742875 3372916 4537301 6689215 10666192 18016089 31599518 56703208 1.03E + 08 1.89E + 08
Demolition floor area (m2)
Dhaka city 816772.8 882114.6 952683.8 1028898 1111210 1200107 1296116 1399805 1511789 1632733 1763351 1904419 2056773
Gazipur 783460 913963.4 1111959 1412350 1868093 2559531 3608556 5200099 7614733 11278131 16836109 25268478 38061772
Savar 762712.1 1012854 1533170 2615468 4866733 9549545 19290166 39551432 81696477 1.69E + 08 3.52E + 08 7.31E + 08 1.52E + 09
Narayanganj 683921.5 762073.1 880194.7 1058729 1328574 1736429 2352880 3284611 4692871 6821377 10038497 14900993 22250387
Keraniganj 603506.6 642916 703779.9 797778 942948.7 1167,150 1513407 2048165 2874046 4149535 6119400 9161658 13860120
Bandar 589903.8 625705.2 683309.4 775994.2 925123.5 1165072 1551147 2172339 3171833 4780013 7367564 11530917 18229726
Rupganj 594523.5 650938 757545.4 959002.9 1339700 2059109 3418586 5987611 10842333 20016371 37352683 70113362 1.32E + 08
Sonargaon 566054.5 595686.3 650449.2 751657 938700.3 1284377 1923227 3103892 5285892 9318473 16771131 30544473 55999146

Appendix 4

Table 13

Table 13.

Identified recycling potential and values of the CDW items based on the field survey

Waste items Project type Avg. WGRi (kg/m2) WC (%) Recycling rate Recycling potential (kg/m2) Recycling value (BDT/tonne) a
Cement DP 50.67 10.93 0.70 3.88 100.00
CP 10.00 11.08 0.70 0.78 100.00
Brick DP 131.14 28.28 0.80 29.67 1820.00
CP 26.00 28.79 0.80 5.99 1820.00
Metal DP 32.42 6.99 1.00 2.27 50000.00
CP 5.42 6.01 1.00 0.33 50000.00
Concrete DP 188.10 40.57 0.70 53.41 188.00
CP 37.13 41.12 0.70 10.69 188.00
Mortar DP 61.35 13.23 0.70 5.68 188.00
CP 11.75 13.01 0.70 1.07 188.00

Source: aHaque et al. (2024)

Appendix 5

Figures 7 and 8

Author contributions

S.E.H.: Conceptualization, Project administration, Funding acquisition, Visualization, Supervision, Writing—Review & Editing. N.N.: Project administration, Funding acquisition, Visualization, Supervision, Writing—Review & Editing. N.N.C., L. G.-K., T. K.S., and M. A. M.: Field survey, Data Collection, Photography, Mapping, Data analysis and interpretation, Figure design, Writing. M. S. H.: Conceptualization, Methodology, Visualization, Field survey, Data analysis and interpretation, Writing-Original Draft.

Funding

The present study is supported by funding from the CTRGC 2021–22 grant cycle of North South University (NSU) under grant no. CTRG-22-SEPS-04.

Data availability

Data will be made available upon reasonable request to the corresponding author.

Declarations

Ethics approval and consent to participate

The research does not deal with human or animal-related subjects. All authors have read, understood, and complied as applicable with the statement on"Ethical responsibilities of Authors"as found in the Instructions for Authors section.

Consent for publication

All authors have reviewed and agreed to the final version of the submitted manuscript for publication.

Competing interests

The authors declare no competing interests.

Footnotes

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

References

  1. Abhishek, M., & Joshi, A. M. (2022). A case study on estimation and composition of construction and demolition waste in Bengaluru. Lecture Notes in Civil EngineeringIn L. Nandagiri, M. C. Narasimhan, S. Marathe, & S. Dinesh (Eds.), Sustainability Trends and Challenges in Civil Engineering (Vol. 162, pp. 1057–1076). Springer. [Google Scholar]
  2. Ahmed, K., & Montu, R. I. (2021). The making of a megacity: How Dhaka transformed in 50 years of Bangladesh. The Guardian. Available at: https://www.theguardian.com/global-development/2021/mar/26/the-making-of-a-megacity-how-dhaka-transformed-in-50-years-of-bangladesh. Accessed 14 Aug 2024.
  3. Ahmed, S., & Bramley, G. (2015). How will Dhaka grow spatially in future?-Modelling its urban growth with a near-future planning scenario perspective. International Journal of Sustainable Built Environment,4, 359–377. 10.1016/j.ijsbe.2015.07.003 [Google Scholar]
  4. Akbas, M., Dayioglu, A.Y., Hatipoglu, M. and Iyisan, R. (2020). Beneficial Use of Recycled Concrete Aggregate as Base and Subbase Material in Turkey. International Conference on Transportation and Development 2020. 10.1061/9780784483183.022
  5. Akhtar, A., & Sarmah, A. K. (2018). Construction and demolition waste generation and properties of recycled aggregate concrete: A global perspective. Journal of Cleaner Production,186, 62–281. 10.1016/j.jclepro.2018.03.085 [Google Scholar]
  6. Andersson, R., & Buser, M. (2022). From waste to resource management? Construction and demolition waste management through the lens of institutional work. Construction Management and Economics,40(6), 1–20. 10.1080/01446193.2022.2081989 [Google Scholar]
  7. Arshad, H., Qasim, M., Thaheem, M. J., Gabriel, H. F. (2017). Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), 19–34. 10.21315/jcdc2017.22.2.2
  8. Aurstad, J., Berntsen, G., & Petkovic, G. (2006). Evaluation of unbound crushed concrete as road building material—mechanical properties vs field performance. In 26th International Baltic Road Conference, 28-30 August 2006, Kuressaare, Estonia, Baltic Road Association.
  9. Balali, A., Gholami, S., Javanmardi, M., Valipour, A., & Yunusa-Kaltungo, A. (2023). Assessment of heavy metal pollution in the soil of a construction and demolition waste landfill. Environmental Nanotechnology, Monitoring & Management,20, 100856. 10.1016/j.enmm.2023.100856 [Google Scholar]
  10. Bianchini, G., Ristovski, I., Milcov, I., Zupac, A., Natali, C., Salani, G., et al. (2020). Chemical characterisation of construction and demolition waste in Skopje City and its surroundings (Republic of Macedonia). Sustainability,12, 2055. 10.3390/su12052055 [Google Scholar]
  11. Bird, J., Li, Y., Rahman, H. Z., Rama, M., & Venables, A. J. (2018). Toward Great Dhaka: A new urban development paradigm eastward. World Bank. 10.1596/978-1-4648-1238-5 [Google Scholar]
  12. BNBC. (2020). Bangladesh National Building Code (BNBC) 2020. Ministry of Housing and Public Works, Dhaka, Government of Bangladesh. Available at: https://hbri.gov.bd/site/page/a5c13d7e-212d-4a16-bbf9-3e1ad937ba56/-. Accessed 05 May 2025.
  13. Boulding, K. E. (1966). The economics of the coming spaceship earth. In H. Jarrett (Ed.), Environmental Quality in a Growing Economy (pp. 3–14). Baltimore. [Google Scholar]
  14. Bravo, J., Valderrama, C., & Ossio, F. (2019). Economic assessment of the construction waste of a high-rise building: A case study. Información Tecnológica,30, 85–94. [Google Scholar]
  15. Cook, E., Velis, C. A., & Black, L. (2022). Construction and demolition waste management: A systematic scoping review of risks to occupational and public health. Frontiers in Sustainability,3, 924926. 10.3389/frsus.2022.924926 [Google Scholar]
  16. Daoud, A. O., Othman, A. A., Robinson, H., & Bayyati, A. (2020). An investigation into solid waste problem in the Egyptian construction industry: A mini-review. Waste Management & Research,38, 371–382. [DOI] [PubMed] [Google Scholar]
  17. Daoud, A. O., Othman, A. A., Ebohon, O. J., & Bayyati, A. (2021). Quantifying materials waste in the Egyptian construction industry: A critical analysis of rates and factors. Ain Shams Engineering Journal,12, 4275–4289. 10.1016/j.asej.2021.02.039 [Google Scholar]
  18. Daoud, A. O., Othman, A. A., Ebohon, O. J., & Bayyati, A. (2023). Analysis of factors affecting construction and demolition waste reduction in Egypt. International Journal of Construction Management,23, 1395–1404. [Google Scholar]
  19. Daoud, A. O., Omar, H., Othman, A. A., & Ebohon, O. J. (2023). Integrated framework towards construction waste reduction: The case of Egypt. International Journal of Civil Engineering,21, 695–709. 10.1007/s40999-022-00793-2 [Google Scholar]
  20. Datta, S. D., Rana, Md. J., Assafi, M. N., Mim, N. J., & Ahmed, S. (2022). Investigation on the generation of construction wastes in Bangladesh. International Journal of Construction Management,23, 1–10. 10.1080/15623599.2022.2050977 [Google Scholar]
  21. De Luca, A., Chen, L., & Gharehbaghi, K. (2020). Sustainable utilization of recycled aggregates: Robust construction and demolition waste reduction strategies. International Journal of Building Pathology and Adaptation,39, 666–682. 10.1108/ijbpa-04-2020-0029 [Google Scholar]
  22. Dewan, A. M., & Yamaguchi, Y. (2009). Land use and land cover change in Greater Dhaka, Bangladesh: Using remote sensing to promote sustainable urbanization. Applied Geography,29(3), 390–401. 10.1016/j.apgeog.2008.12.005 [Google Scholar]
  23. Ding, Z., Wang, X. H., & Zou, P. X. W. (2023). Barriers and countermeasures of construction and demolition waste recycling enterprises under circular economy. Journal of Cleaner Production,420, 138235–138235. 10.1016/j.jclepro.2023.138235 [Google Scholar]
  24. Diotti, A., Plizzari, G., & Sorlini, S. (2021). Leaching behaviour of construction and demolition wastes and recycled aggregates: Statistical analysis applied to the release of contaminants. Applied Sciences,11, 6265. 10.3390/app11146265 [Google Scholar]
  25. Esa, M. R., Halog, A., & Rigamonti, L. (2017). Developing strategies for managing construction and demolition wastes in Malaysia based on the concept of circular economy. Journal of Material Cycles and Waste Management,19, 1144–1154. 10.1007/s10163-016-0516-x [Google Scholar]
  26. Fatemi, M. N. (2012). Strategies to reduce construction and demolition (CDW) waste for sustainable building design in Dhaka: Role of architects (pp. 543–550). Education, Practice and Research, Bangladesh University of Engineering and Technology, Dhaka. [Google Scholar]
  27. Ferronato, N., Fuentes Sirpa, R. C., Guisbert Lizarazu, E. G., Conti, F., & Torretta, V. (2023). Construction and demolition waste recycling in developing cities: Management and cost analysis. Environmental Science and Pollution Research,30(9), 24377–24397. [DOI] [PMC free article] [PubMed] [Google Scholar]
  28. Guerra, B. C., Bakchan, A., Leite, F., & Faust, K. M. (2019). BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams. Waste Management,87, 825–832. [DOI] [PubMed] [Google Scholar]
  29. Günther, A., Asaduzzaman, A., Bahls, R., Ludwig, R., Ashraful Kamal, M. and Nahar Faruqa, N. (2015). Geo-information for sustainable urban development of Greater Dhaka City, Bangladesh. NASA ADS, 17, p.8793. Available at: https://ui.adsabs.harvard.edu/abs/2015EGUGA..17.8793G/abstract [Accessed 6 Mar. 2024].
  30. Habiba, U., Haider, F., Ishtiaque, A., Mahmud, M. S., & Masrur, A. (2011). Remote sensing & GIS based spatio-temporal change analysis of wetland in Dhaka City, Bangladesh. Journal of Water Resource and Protection,3(11), 781–787. 10.4236/jwarp.2011.311088 [Google Scholar]
  31. Haque, M. S. (2019). Sustainable use of plastic brick from waste PET plastic bottle as building block in Rohingya refugee camp: A review. Environmental Science and Pollution Research,26, 36163–36183. 10.1007/s11356-019-06843-y [DOI] [PubMed] [Google Scholar]
  32. Haque, M. S., & Sharif, S. (2021). The need for an effective environmental engineering education to meet the growing environmental pollution in Bangladesh. Cleaner Engineering and Technology,4, 100114. 10.1016/j.clet.2021.100114 [Google Scholar]
  33. Haque, M. S., Uddin, S., Sayem, S., & Mohib, K. M. (2021). Coronavirus disease 2019 (COVID-19) induced waste scenario: A short overview. Journal of Environmental Chemical Engineering,9, 104660. 10.1016/j.jece.2020.104660 [DOI] [PMC free article] [PubMed] [Google Scholar]
  34. Haque, S. E., Shahriar, M. M., Nahar, N., & Haque, M. S. (2022). Impact of brick kiln emissions on soil quality: A case study of Ashulia Brick Kiln Cluster. Bangladesh. Environmental Challenges,9, 100640. 10.1016/j.envc.2022.100640 [Google Scholar]
  35. Haque, M. K. A., Mouwa, Z., & Khan, M. N. H. K. (2023). Construction and destruction waste management practices to reduce environmental impact in Bangladesh. Australian Journal of Engineering and Innovative Technology,5(4), 154–162. 10.34104/ajeit.023.01540162 [Google Scholar]
  36. Haque, S. E., Nahar, N., & Haque, M. S. (2024). A study on the waste generation rates and recycling potential for the construction and demolition waste in Dhaka. Bangladesh. Environmental Monitoring and Assessment,196, 183. 10.1007/s10661-024-12329-3 [DOI] [PubMed] [Google Scholar]
  37. Islam, R., Nazifa, T. H., Yuniarto, A., Shanawaz Uddin, A. S. M., Salmiati, S., & Shahid, S. (2019). An empirical study of construction and demolition waste generation and implication of recycling. Waste Management,95, 10–21. 10.1016/j.wasman.2019.05.049 [DOI] [PubMed] [Google Scholar]
  38. Ismail, E. R., El-Mahdy, G. M., Ibrahim, A. H., & Daoud, A. O. (2023). Analysis of factors affecting construction and demolition waste safe disposal in Egypt. Alexandria Engineering Journal,70, 515–523. [Google Scholar]
  39. Karim, M. (2021). Urban expansion in Dhaka and its heat island effect. The Business Standard, Dhaka. Available at: https://www.tbsnews.net/thoughts/urban-expansion-dhaka-and-its-heat-island-effect-292240 [Accessed 14 Aug 2024].
  40. Khan, N. S., Shawal, S., Hossain, M. A., Tasnim, N., Whitehead, P., & Rahman, M. (2024). Assessing flooding extent and potential exposure to river pollution from urbanizing peripheral rivers within Greater Dhaka watershed. Scientific Reports,14, 29341. 10.1038/s41598-024-80063-4 [DOI] [PMC free article] [PubMed] [Google Scholar]
  41. Kitchenham, B. A., & Pfleeger, S. L. (2002). Principles of survey research: Part 5: Populations and samples. ACM SIGSOFT Software Engineering Notes,27, 2267. [Google Scholar]
  42. Küpfer, C., Bastien-Masse, M., & Fivet, C. (2023). Reuse of concrete components in new construction projects: Critical review of 77 circular precedents. Journal of Cleaner Production,383, 135235. 10.1016/j.jclepro.2022.135235 [Google Scholar]
  43. Landes, F., Calcio, M., Sobolewski, J., Wallens-Logan, K., Ledeczi, A., Kiro, Y., Bolge, L., Ross, J., Chillrud, S., Mailloux, B., & Geen, A. (2023). Widespread Pb contamination in urban backyard soils for >100 years identified in soil cores constrained by 210Pb and 137Cs. Science of the Total Environment,899, 165407. 10.1016/j.scitotenv.2023.165407 [DOI] [PubMed] [Google Scholar]
  44. Letelier, V., Tarela, E., & Moriconi, G. (2017). Mechanical properties of concretes with recycled aggregates and waste brick powder as cement replacement. Procedia Engineering,171, 627–632. 10.1016/j.proeng.2017.01.396 [Google Scholar]
  45. Li, X. (2008). Recycling and reuse of waste concrete in China. Resources, Conservation and Recycling,53, 36–44. 10.1016/j.resconrec.2008.09.006 [Google Scholar]
  46. Lu, W., Yuan, H., Li, J., Hao, J. J., Mi, X., & Ding, Z. (2011). An empirical investigation of construction and demolition waste generation rates in Shenzhen city. South China. Waste Management,31(4), 680–687. [DOI] [PubMed] [Google Scholar]
  47. Lu, W., Du, L., & Feng, Y. (2022). Decision making behaviours and management mechanisms for construction and demolition waste recycling based on public–private partnership. Environmental Science and Pollution Research,29(54), 82078–82097. 10.1007/s11356-022-21221-x [DOI] [PubMed] [Google Scholar]
  48. Ma, M., Tam, V. W. Y., Le, K. N., & Li, W. (2020). Challenges in current construction and demolition waste recycling: A China study. Waste Management,118, 610–625. 10.1016/j.wasman.2020.09.030 [DOI] [PubMed] [Google Scholar]
  49. Macrotrends (2023). Bangladesh metro area population 1950–2023. https://www.macrotrends.net/cities/20119/dhaka/population#:~:text=The%20metro%20area%20population%20of,a%203.5%25%20increase%20from%202020. Accessed 15 Aug 2024.
  50. Mahdi, Z. A. Z. (2017). Evaluation of using the crushed concrete aggregate as unbound pavement layer. Journal of Babylon University/engineering Sciences,25, 1478–1484. [Google Scholar]
  51. Makul, N., Fediuk, R., Amran, M., Zeyad, A. M., de Azevedo, A. R. G., Klyuev, S., Vatin, N., & Karelina, M. (2021). Capacity to develop recycled aggregate concrete in South East Asia. Buildings,11, 234. 10.3390/buildings11060234 [Google Scholar]
  52. Martínez-Muñoz, D., Martí, J. V., & Yepes, V. (2021). Comparative life cycle analysis of concrete and composite bridges varying steel recycling ratio. Materials,14, 4218. 10.3390/ma14154218 [DOI] [PMC free article] [PubMed] [Google Scholar]
  53. Menegaki, M., & Damigos, D. (2018). A review on current situation and challenges of construction and demolition waste management. Current Opinion in Green and Sustainable Chemistry,13, 8–15. [Google Scholar]
  54. Mohammed, T. U., Hossain, K. I., Anik, M. I., Miraz, I. H., Ahmed, T., and Awal, M. A. (2019). Recycling of concrete made with brick aggregate: an extended study. Fifth International Conference on Sustainable Construction Materials and Technologies, Coventry University, UK., 108–123. 10.18552/2019/IDSCMT5015
  55. Moschen-Schimek, J., Kasper, T., & Huber-Humer, M. (2023). Critical review of the recovery rates of construction and demolition waste in the European Union – an analysis of influencing factors in selected EU countries. Waste Management,167, 150–164. 10.1016/j.wasman.2023.05.020 [DOI] [PubMed] [Google Scholar]
  56. Nayeem, S. U., Rashid, H., Habib, T., Haque, M. S., Haque, S. E., & Nahar, N. (2022). Identification of construction and demolition waste generation rates, and recycling and reuse potential: A case of Dhaka City. In 6th International Conference on Advances in Civil Engineering (ICACE-2022), 21-23 December 2022 (pp. 61–68). CUET.
  57. Ngieng, H. Y., Hadibarata, T., & Rubiyatno,. (2021). Utilization of construction and demolition waster and environmental management practice in South East Asian countries. Tropical Aquatic and Soil Pollution,1, 46–61. 10.53623/tasp.v1i1.13 [Google Scholar]
  58. Nwakaire, C. M., Yap, S. P., Onn, C. C., Yuen, C. W., & Ibrahim, H. A. (2020). Utilisation of recycled concrete aggregates for sustainable highway pavement applications; a review. Construction and Building Materials,235, 117444. 10.1016/j.conbuildmat.2019.117444 [Google Scholar]
  59. Ogunmakinde, O., Sher, W., & Egbelakin, T. (2022). Construction waste management in Nigeria using the 3R principle of the circular economy. In: Ren, J., Zhang, L. (eds), Circular Economy and Waste Valorisation. Industrial Ecology and Environmental Management,2, 177–195. [Google Scholar]
  60. Oliveira, M., Arantes, E., & Fonseca, A. (2021). Strategies to promote circular economy in the management of construction and demolition waste at the regional level: A case study in Manaus, Brazil. Clean Technologies and Environmental Policy,23, 2713–2725. 10.1007/s10098-021-02197-7 [Google Scholar]
  61. Palinkas, L. A., Horwitz, S. M., Green, C. A., Wisdom, J. P., Duan, N., & Hoagwood, K. (2015). Purposeful Sampling for Qualitative Data Collection and Analysis in Mixed Method Implementation Research. Administration and Policy in Mental Health and Mental Health Services Research,42, 533–544. 10.1007/s10488-013-0528-y [DOI] [PMC free article] [PubMed] [Google Scholar]
  62. Pallewatta, S., Weerasooriyagedara, M., Bordoloi, S., Sarmah, A. K., & Vithanage, M. (2023). Reprocessed construction and demolition waste as an adsorbent: An appraisal. Science of the Total Environment,882, 163340. 10.1016/j.scitotenv.2023.163340 [DOI] [PubMed] [Google Scholar]
  63. Papamichael, I., Voukkali, I., Loizia, P., & Zorpas, A. A. (2023). Construction and demolition waste framework of circular economy: A mini review. Waste Management & Research,41, 1728–1740. 10.1177/0734242X231190804 [DOI] [PMC free article] [PubMed] [Google Scholar]
  64. Parisi Kern, A., Ferreira Dias, M., Piva Kulakowski, M., & Paulo Gomes, L. (2015). Waste generated in high-rise buildings construction: A quantification model based on statistical multiple regression. Waste Management,39, 35–44. 10.1016/j.wasman.2015.01.043 [DOI] [PubMed] [Google Scholar]
  65. Pearce, D., & Turner, R. K. (1990). Economics of natural resources and the environment. Johns Hopkins University Press. [Google Scholar]
  66. Prema, E. (2021). Solid waste management in the construction sector: A prerequisite for achieving sustainable development goals. IOP Conference Series: Earth and Environmental Science,850(1), 012007. 10.1088/1755-1315/850/1/012007 [Google Scholar]
  67. Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2022). Circular economy of construction and demolition waste: A literature review on lessons, challenges, and benefits. Materials,15, 76. 10.3390/ma15010076 [DOI] [PMC free article] [PubMed] [Google Scholar]
  68. Rahaman, M. O., Mostafa, T., & Mamun, M. (2020). Scarcity of road construction materials in Bangladesh: Exploring pavement recycling option as a solution. International Journal of Structural and Civil Engineering Research,9(1), 25–33. 10.18178/ijscer.9.1.25-3 [Google Scholar]
  69. Rahim, M., Kasim, N., Mohamed, I., Zainal, R., Sarpin, N., & Saikah, M. (2017). Construction waste generation in Malaysia construction industry: Illegal dumping activities. IOP Conference Series: Materials Science and Engineering,271, 012040. 10.1088/1757-899X/271/1/012040 [Google Scholar]
  70. Rahman, M. M., Begum, D. A., Ahmed, N. (2015). Bangladesh air pollution studies (BAPS): Task 5 (industrial emission estimates). NILU OR 63/2014, Norwegian Institute for Air Research (NILU).
  71. Ram, V., & Kalidindi, S. (2017). Estimation of construction and demolition waste using waste generation rates in Chennai, India. Waste Management & Research,35, 1–8. 10.1177/0734242X17693297 [DOI] [PubMed] [Google Scholar]
  72. Rashid, M., Kabir, M. R., & Zaman, M. M. I. (2023). Padma Bridge in Global Media and Boost to SDGs in Bangladesh. Journalism and Media,4(2), 445–466. 10.3390/journalmedia4020029 [Google Scholar]
  73. Roy, M. (2009). Planning for sustainable urbanisation in fast growing cities: Mitigation and adaptation issues addressed in Dhaka. Bangladesh. Habitat International,33(3), 276–286. 10.1016/j.habitatint.2008.10.022 [Google Scholar]
  74. Roy, S., Sowgat, T., & Mondal, J. (2019). City profile: Dhaka, Bangladesh. Environment and Urbanization ASIA,10(2), 216–232. 10.1177/0975425319859126 [Google Scholar]
  75. Roy, S. (2021). Sustainable urbanisation in Bangladesh and Dhaka: challenges and way forward. Available at: https://asef.org/wp-content/uploads/2021/11/ASEFSU23-Background-Paper_Sustainable-Urbanisation-in-Bangladesh-Dhaka.pdf [Accessed 15 Aug 2024].
  76. Siddiqui, M. S. (2024). Urbanise east Dhaka in a planned way. The Daily Observer. Available at: https://observerbd.com/news.php?id=471199. Accessed 14 Aug 2024.
  77. Stępień, J., & Maciejewski, K. (2022). Using reclaimed cement concrete in pavement base mixes with foamed bitumen produced in cold recycling technology. Materials,15(15), 5175. 10.3390/ma15155175 [DOI] [PMC free article] [PubMed] [Google Scholar]
  78. Suthar, S., Rayal, P., & Ahada, C. (2016). Role of different stakeholders in trading of reusable/recyclable urban solid waste materials: A case study. Sustainable Cities and Society,22, 104–115. [Google Scholar]
  79. Swetha, K. S., Tezeswi, T. P., & Kumar, M. V. (2022). Implementing construction waste management in India: An extended theory of planned behaviour approach. Environmental Technology & Innovation,27, 102401. [Google Scholar]
  80. Tang, Z., Li, W., Tam, V. W. Y., & Xue, C. (2020). Advanced progress in recycling municipal and construction solid wastes for manufacturing sustainable construction materials. Resources, Conservation and Recycling: X,6, 100036. 10.1016/j.rcrx.2020.100036 [Google Scholar]
  81. Tihomirovs, P., Kara, P., & Korjakins, A. (2023). Demolition waste glass usage in the construction industry. Infrastructures,8(12), 182–182. 10.3390/infrastructures8120182 [Google Scholar]
  82. Tuladhar, R., Marshall, A. and Sivakugan, N. (2020). Use of recycled concrete aggregate for pavement construction. In: F. Pacheco-Torgal, Y. Ding, F. Colangelo, R. Tuladhar, A. Koutamanis (eds.), Advances in Construction and Demolition Waste Recycling, Woodhead Publishing, 181–197. 10.1016/B978-0-12-819055-5.00010-3
  83. Turkyilmaz, A., Guney, M., Karaca, F., Bagdatkyzy, Z., Sandybayeva, A., & Sirenova, G. (2019). A comprehensive construction and demolition waste management model using PESTEL and 3R for construction companies operating in Central Asia. Sustainability,11(6), 1593. 10.3390/su11061593 [Google Scholar]
  84. Ullah, S., Liu, Q., Wang, S., Jan, A., Sharif, H., Ditta, A., Wang, G., & Cheng, H. (2023). Sources, impacts, factors affecting Cr uptake in plants, and mechanisms behind phytoremediation of Cr-contaminated soils. Science of the Total Environment,899, 165726. 10.1016/j.scitotenv.2023.165726 [DOI] [PubMed] [Google Scholar]
  85. Umar, T. (2022). Greenhouse gas (GHG) emissions from municipal solid waste (MSW) in Oman. International Journal of Social Ecology and Sustainable Development,13, 1–26. [Google Scholar]
  86. UN. (2018). The speed of urbanization around the world. POPFACTS, No. 2018/1, Department of Economic and Social Affairs, Population Division, United Nations (UN). Available at: https://population.un.org/wup/assets/WUP2018-PopFacts_2018-1.pdf. Accessed 05 May 2025.
  87. UNEP. (2015). Global waste management outlook. United Nations Environment Programme (UNEP). Available at: https://www.unep.org/resources/report/global-waste-management-outlook. Accessed 05 May 2025.
  88. Villoria-Sáez, P., Porras-Amores, C., & Merino, M. (2020). Estimation of construction and demolition waste. In: F. Pacheco-Torgal, Y. Ding, F. Colangelo, R. Tuladhar, A. Koutamanis (eds.), Advances in Construction and Demolition Waste Recycling, Woodhead Publishing, 13–30. 10.1016/B978-0-12-819055-5.00002-4
  89. Wang, L., & Sarker, P. K. (2020). Analyzing urban sprawl and sustainable development in Dhaka, Bangladesh. Journal of Economics and Sustainable Development,11(6), 9–20. 10.7176/jesd/11-6-02 [Google Scholar]
  90. Wang, Q., Chen, L., Hu, R., Ren, Z., He, Y., Liu, D., & Zhou, Z. (2020). An empirical study on waste generation rates at different stages of construction projects in China. Waste Management & Research,38(4), 433–443. [DOI] [PubMed] [Google Scholar]
  91. WB (The World Bank) (2007). Dhaka: improving living conditions for the urban poor. Bangladesh Development Series, Paper No. 17. Available at: https://documents1.worldbank.org/curated/en/938981468013830990/pdf/404240BD0Dhaka10ALSO03582401PUBLIC1.pdf [Accessed 6 Mar 2024].
  92. WB (The World Bank) (2012). Operationalizing political economy: brick industry in Bangladesh. Available at: https://documents1.worldbank.org/curated/en/870271468006631092/pdf/693660BRI0P10800in0Bangladesh0final.pdf [Accessed 10 Mar 2024].
  93. Whittaker, M. J., Grigoriadis, K., Soutsos, M., Sha, W., Klinge, A., Paganoni, S., Casado, M., Brander, L., Mousavi, M., Scullin, M., Correia, R., Zerbi, T., Staiano, G., Merli, I., Ingrosso, I., Attanasio, A., & Largo, A. (2019). Novel construction and demolition waste (CDW) treatment and uses to maximize reuse and recycling. Advances in Building Energy Research,15(2), 253–269. 10.1080/17512549.2019.1702586 [Google Scholar]
  94. Wu, G., Wang, L., Yang, R., Hou, W., Zhang, S., Guo, X., & Zhao, W. (2022). Pollution characteristics and risk assessment of heavy metals in the soil of a construction waste landfill site. Ecological Informatics,70, 101700. 10.1016/j.ecoinf.2022.101700 [Google Scholar]
  95. Xiao, J., Cheng, Z., Zhou, Z., & Wang, C. (2022). Structural engineering applications of recycled aggregate concrete: Seismic performance, guidelines, projects and demonstrations. Case Studies in Construction Materials,17, e01520. 10.1016/j.cscm.2022.e01520 [Google Scholar]
  96. Yazdani, M., Kabirifar, K., Frimpong, B., Shariati, M., Mirmozaffari, M., & Boskabadi, A. (2021). Improving construction and demolition waste collection service in an urban area using a simheuristic approach: A case study in Sydney Australia. Journal of Cleaner Production,280, 124138. 10.1016/j.jclepro.2020.124138 [Google Scholar]
  97. Yuan, H., & Shen, L. (2011). Trend of the research on construction and demolition waste management. Waste Management,31(4), 670–679. [DOI] [PubMed] [Google Scholar]
  98. Zhang, C., Hu, M., Di Maio, F., Sprecher, B., Yang, X., & Tukker, A. (2022). An overview of the waste hierarchy framework for analyzing the circularity in construction and demolition waste management in Europe. Science of the Total Environment,803, 149892. 10.1016/j.scitotenv.2021.149892 [DOI] [PubMed] [Google Scholar]
  99. Zheng, L., Wu, H., Zhang, H., Duan, H., Wang, J., Jiang, W., et al. (2017). Characterizing the generation and flows of construction and demolition waste in China. Construction and Building Materials,136, 405–413. 10.1016/j.conbuildmat.2017.01.055 [Google Scholar]
  100. Zhu, L. and Zhu, Z. (2020). Reuse of clay brick waste in mortar and concrete. Advances in Materials Science and Engineering, 6326178. 10.1155/2020/6326178

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Availability Statement

Data will be made available upon reasonable request to the corresponding author.