Skip to main content
. 2025 May 15;15:16890. doi: 10.1038/s41598-025-01487-0

Fig. 6.

Fig. 6

Development of soil drainage-water NO3--N concentration (a), and NO3--N leaching losses (b) through the monitoring period at 0.45 m depth for the three treatments: Ante, “A”; Ante + Post, “A + P” and Post, “P”. Filled triangles represent fertigations on both “A + P” and “P”, while empty ones represent fertigations only for “P” treatment. The dashed line indicates a long period without measurements.