TABLE 3.
Time required for each manual step and the total manual fabrication time for three methods.
| Procedure | Impression compound trimming (s) | Light curing (s) | CAD and 3DP (s) | F | P-value |
|---|---|---|---|---|---|
| Initial Preparation | 307.28 ± 12.15 | 482.36 ± 34.21* | 427.63 ± 10.88*# | 168.52 | <0.001 |
| Core Fabrication | 1795.34 ± 76.42 | 634.19 ± 45.83* | 763.19 ± 32.74*# | 432.17 | <0.001 |
| Post-Processing | 496.85 ± 27.15 | 589.47 ± 38.62* | 199.83 ± 12.25*# | 245.89 | <0.001 |
| Total manual fabrication time | 2,578.92 ± 113.45 | 1705.92 ± 118.76* | 1,403.74 ± 81.63*# | 385.74 | <0.001 |
Note: All data are expressed as means ± standard deviations. CAD, computer-aided design; 3DP, three-dimensional printing. * Compared to Impression compound trimming group, P < 0.05. # Compared to Light curing group, P < 0.05.