Skip to main content
. 2025 Jul 4;66(5):114. doi: 10.1007/s00362-025-01723-9

Table 12.

Average time elapsed (in seconds) to run each of the considered methods across the 50 data sets of size Inline graphic simulated from each generating component distribution. The first row shows the number of parameters (q) estimated per method, and the last row is the average run time across all scenarios

Considered method
Generating distribution MPTMSCN MMTMSCN MCN MMSCN MPTCN
q 47 47 31 39 39
PTMSCN 40.83 12.25 0.25 4.31 14.41
MTMSCN 30.27 10.51 0.07 15.92 16.97
CN 12.76 10.07 0.08 16.53 6.03
MSCN 19.55 8.61 0.07 17.36 7.02
PTCN 24.84 9.40 0.07 16.40 8.73
GHD 14.84 7.93 0.07 16.92 5.54
NOT 9.57 6.95 0.07 16.98 2.93
NTO 8.23 8.31 0.07 14.86 3.13
Average elapsed time 17.76 9.05 0.07 16.22 7.21