Table 4.
Structural equation model parameter estimation.
Hypothesis | Path | Estimate | S. E. | C. R. | Std β | t-values | Hypothesis testing |
---|---|---|---|---|---|---|---|
H1 | INT → BEH | 0.003 | 0.088 | 0.034 | 0.002 | 0.973 | Not supported |
H3 | ATT → INT | 0.626 | 0.090 | 6.978 | 0.751 | 0.000 | Supported |
H4 | SN → INT | 0.099 | 0.081 | 1.221 | 0.118 | 0.222 | Not supported |
H5 | PBC → INT | 0.130 | 0.043 | 3.040 | 0.148 | 0.002 | Supported |
H6 | PBC → BEH | 1.127 | 0.102 | 11.096 | 0.841 | 0.000 | Supported |
H2 | HC → ATT | 1.793 | 0.167 | 10.764 | 0.921 | 0.000 | Supported |
H7 | TR → INT | 0.059 | 0.017 | 3.524 | 0.115 | 0.000 | Supported |