Run Dope solution flow rate (ml/min) Bore fluid flow rate (ml/min) Air gap distance (cm) AC-MgO concentration (wt%) PWP (L/m2.h.bar)
S1 2.5 6.5 42 0.18 22.5862 ± 1.2501
S2 2.5 6.5 22 0.18 22.2255 ± 1.0532
S3 2.5 6.5 22 0.18 25.8787 ± 0.9345
S4 2.5 6.5 22 0.18 19.2058 ± 0.8548
S5 2.5 6.5 22 0.18 18.5656 ± 1.1521
S6 2.5 6.5 22 0.18 17.9255 ± 1.1658
S7 2.5 6.5 22 0.18 17.2853 ± 1.3812
S8 2.5 6.5 2 0.18 3.19596 ± 1.0259
S9 3.5 6.5 22 0.18 20.9336 ± 1.1721
S10 2.5 9.5 22 0.18 20.1812 ± 1.1259
S11 2.5 3.5 22 0.18 10.0456 ± 0.8441
S12 1.5 6.5 22 0.18 15.4562 ± 0.9548
S13 2 8 12 0.27 18.2158 ± 0.8521
S14 3 8 12 0.27 26.3672 ± 1.1597
S15 2 5 12 0.27 8.40641 ± 1.0025
S16 3 5 12 0.27 16.6301 ± 1.8546
S17 2 8 32 0.27 37.8696 ± 1.0234
S18 2 5 32 0.27 25.7778 ± 1.2255
S19 3 5 32 0.27 37.9751 ± 0.8155
S20 3 8 32 0.27 47.7107 ± 0.7544
S21 3 8 12 0.09 12.4712 ± 1.1288
S22 3 5 12 0.09 15.2051 ± 1.0033
S23 2 8 12 0.09 10.4522 ± 0.9547
S24 2 5 12 0.09 16.7426 ± 1.2537
S25 2 5 32 0.09 24.3416 ± 0.8546
S26 3 5 32 0.09 22.4909 ± 1.2351
S27 3 8 32 0.09 31.1026 ± 1.1565
S28 2 8 32 0.09 24.6475 ± 1.3021
S29 2.5 6.5 22 0.36 50.7385 ± 0.9658
S30 2.5 6.5 22 0 29.987 ± 1.2026