Results of thermoeconomic assessment for proposed plant.

Component Inline graphic Inline graphic, $/yr Inline graphic, $/yr Inline graphic, $/yr Inline graphic, $/yr
Boiler 45.2 0.50 621.8 613 764
Turbine 90.0 10.60 101,503 90307.5 11,196
Pump 69.85 0.98 3656.5 2552 1104
Condenser (ORC) 1.0 157.51 70,863 794 70,854
Steam Generator 38.30 0.87 628.0 240.2 388
Heat Exchanger (ORC) 13.18 0.43 2100.3 322.72 2093
Evaporator 77.40 27.40 1304.4 1303 381.5
Condenser (Ejector) 37.72 4.60 4716 1776 2940
Ejector 0.0 5.72 5876 0.0 5876
Expansion valve 73.65 1.07 1.9 0.6 1.4
Whole plant 20.18 26.07 484,577 97,907 386,672