The stage construction simulation for the excavation-tunnel problem.

Simulation stages Description
0 Generation the initial stress
1 Simulation additional stress field caused by tunnel
2 Installation of the diaphragm wall
3, 5, 7, 9, 11 and 13 Excavation in front of the diaphragm wall at the levels of -3, -5, -8, -11, -14 and -17 m