Skip to main content
. 2025 Aug 18;2025:5842526. doi: 10.1155/jonm/5842526

Table 4.

Results of convergent validity.

Dimensions Item Standardized factor loading AVE value CR value
Manager support Item 1 0.7690 0.6226 0.9081
Item 2 0.7639
Item 4 0.8037
Item 6 0.8146
Item 7 0.8193
Item 8 0.7614

Work condition support Item 12 0.8150 0.6139 0.8616
Item 15 0.8094
Item 16 0.8919
Item 17 0.5839

Colleague support Item 20 0.7466 0.5721 0.8413
Item 21 0.8275
Item 22 0.7980
Item 23 0.6399