Skip to main content
. 2025 Aug 29;15:31813. doi: 10.1038/s41598-025-17290-w

Table 12.

Statistical table of settlement values at main monitoring points.

Settlement value (mm) F1 F4 F8 F9 F13 F16
Pre-grouting reinforcement −100 −106 −57 −11 −26 −55
Post-grouting reinforcement Field measurement −15.09 −25.7 −17.34 −3.53 −14.51 −2.47
Numerical simulation −20.3 −22.6 −9.3 −6.3 −15.3 −6.3