Numerical simulation working conditions.

Simulated working condition
Buildings’ initial deformation Case 1: The initial condition of the building
Reasons for building settlement and inclination Pile length Case 2 − 1
Case 2–2
Weak soil layer Case 3 − 1
Case 3 − 2
Correction plan Grouting scope Case 4 − 1
Case 4 − 2
Case 4 − 3
Soil strength Case 5 − 1
Case 5 − 2
Case 5 − 3