Skip to main content
. 2025 Aug 29;15:31813. doi: 10.1038/s41598-025-17290-w

Table 6.

Designed to simulate working conditions.

Factors contributing to building settlement and tilting Simulated working conditions
Case 1: The initial condition of the building
Pile length Case 2 − 1: All piles are 12.6 m in length
Case 2–2: All piles are 14.3 m in length
Weak soil layer Case 3 − 1: The topsoil consists of fine sand.
Case 3 − 2: The topsoil consists of medium sand