Skip to main content
. 2025 Oct 2;16:1581298. doi: 10.3389/fpsyt.2025.1581298

Table 2.

Baseline and follow-up acceptance scores for the subset of patients who completed both surveys (n = 246).

Construct Initial survey mean (SD) Follow up survey mean (SD) Paired T-Test
ITU 4.25 (0.79) 4.26 (4.81) 0.828
PU 4.21 (0.70) 4.13 (0.75) 0.107
PEOU 4.30 (0.64) 4.41 (0.68) 0.018*
A 4.36 (0.66) 4.25 (0.73) 0.022*
T 4.23 (0.78) 4.23 (0.80) 0.964
TA 3.99 (1.03) 4.00 (1.05) 0.935
SI 3.88 (0.75) 3.88 (0.74) 0.874
PHT 3.80 (1.06) 3.82 (1.16) 0.725