Table 2.
Relative contribution of technical variables to collective performance variability.
| Technical variable | β | p-valor | Relative contribution (%) |
|---|---|---|---|
| Relative elevation (m/km) | 0.42 | <0.001 | 45% |
| Unpaved percentage (%) | 0.23 | <0.01 | 25% |
| Distance (km) | 0.18 | <0.05 | 20% |
| Vertical gain (m) | 0.11 | <0.05 | 10% |