Skip to main content
. 2025 Nov 4;13:1672415. doi: 10.3389/fpubh.2025.1672415

Table 4.

Comparison of EIS scores and SEE-C scores between two intervention groups before and after management.

Variable Group Pre-test Post-test Within-group comparison Between-group comparison (post-test)
t-value, p-value Hedges’ g (95% CI) t-value, p-value Hedges’ g (95% CI)
EIS score Weekly feedback (n = 15) 41.13 ± 8.98 55.67 ± 7.12 t = 13.22, p < 0.001*** 2.21 (4.66, 2.00) t = −0.45, p = 0.455 −0.16 (−0.86, 0.54)
Monthly feedback (n = 15) 43.47 ± 7.15 56.73 ± 5.86 t = 10.47, p < 0.001*** 2.63 (3.70, 1.54)
SEE-C score Weekly feedback (n = 15) 48.00 ± 11.86 73.80 ± 8.49 t = 8.80, p < 0.001*** 3.32 (3.15, 1.25) t = 2.17, p = 0.044* 0.77 (0.39, 1.49)
Monthly feedback (n = 15) 48.33 ± 15.85 59.93 ± 23.29 t = 2.28, p = 0.039* 0.57 (1.10, 0.03)

Data are presented as mean ± SD. Within-group comparisons (pre vs. post) were analyzed using paired-samples t-tests. Between-group comparisons at post-test were analyzed using independent-samples t-tests. Effect sizes are reported as Hedges g with 95% confidence intervals. p < 0.05, ***p < 0.001.